Last updated on 30 Jul 21
30
JUL 21: Status of ongoing review of transfer orders kept in abeyance since last
two months: SNEA MH is continuously getting queries from members about
over delayed review of the transfer orders kept in abeyance on 02/06/2021.
·
In this regards it
is to inform that the review of these old orders has been started with
restoration of Tenure station orders was issued on 26/06/2021 in first phase.
·
Since then second
phase of review of transfers from Non-Tenure to Non-Tenure is going on and SNEA
MH has repeatedly held meeting with CGMT MH, GM HR Admn Mumbai and CE Civil
Mumbai who is till in charge of review of the orders kept in abeyance.
·
It
has been assured to us by CGMT MH and CE Civil Mumbai that orders for filling
shortage is certain SSAs and ERP relieving of Executives to and from Tenure
stations will be issued in this week.
·
Though CGMT MH has
expressed displeasure over the undue delay in restoration of orders, the things
are not moving forward as directed and assured by CGMT MH.
·
Today is last day of
this week by which CE Civil and CGMT MH have assured to at least issue second
phase of transfer orders i.e. filling vacant post in shortage SSA and then ERP
relieving of executives to and from Tenure stations.
·
We have seen that CE
Civil and DGM Leal are working on it continuously and on many occasions matter
has been discussed with CGMT MH, but till the final shape is not given and it
has created much unrest among the executives. As seen in the past, the normally
such orders are issued on Saturday, hopefully today being Saturday, the full
stop will be given to ongoing discussions between these officers and matter
will be firmly decided by CGMT MH and orders will be issued giving relief to
executives who are kept in tension and pressure for last two months.
·
Otherwise, SNEA MH
will again take up matter with CGMT MH for completing this review work by these
officer either by removing these officers from other works for 2-3 days so that
they can focus on this review work only or otherwise change the officers who
are not able to complete this review for last two months and either CGMT MH
should take this review or nominate other efficient officers who can complete
this work in time bound manner and give relief to the executives who are facing
hardship due to undue delay in restoration of the transfer orders kept in
abeyance since last two months.
·
SNEA MH appeals all
the affected comrades to keep some more patience and we fully agree with
difficulties and hardship faced and expressed by the affected comrades, and
assure that these manmade issues will be surely settled very shortly and its
matter of just few days. Let us hope for the best.
30
JUL 21: DGM Admn BSNL CO writes to Circle/Unit Heads conveying
detail about “BSNL Employees Health Insurance Policy 2021” which will be
implemented w.e.f. 01/09/2021. Letter <<<>>>
·
Though this is matter related to employees, DGM
Admn has failed to mark its copy to Unions and Associations which should have
been given in routine and normal course of action.
·
This policy will be optional and its premium is
to be paid by employees.
·
Willing employees will have to submit the options
through ERP/ESS Login Portal after opening PoP UP Window and its dates will be
announced separately.
·
The Insurance Cover of Rs Five Lakhs will be
available to all employees with Top up value of Rs 5 Lakhs.
·
The Insurance Cover of Rs Ten Lakhs will be
available to all employees in pay scale of E5 and above with optional Top up
value of Rs 5 Lakhs and Rs Ten Lakhs.
·
There should not have been any restriction
depending on pay scales and it also should have kept optional for all
employees.
·
This Policy will be valid for one year and
renewable thereafter with mutual consent between BSNL and Insurance Company.
·
The premium applicable will be different
depending on Insurance Cover required and option given to included parents
under this policy.
·
This would have been best policy if the premium
of policy is paid by BSNL even by reducing / stopping benefits being given
under BSNL MRS Scheme.
·
It was also possible that the premium amount of
this insurance is reimbursed from or adjusted with the annual limit of outdoor
medical claims of employees and this would have saved lot of money of BSNL.
·
But it is unfortunate that nowadays it is seen
that every burdon on part of management is systematically passed on to
employees and in one sided action employees are compelled to pay the different
premiums from their salary that to be without grant of Pay revision and
continued Pay anomalies including Standard pay scales and related issues.
·
It is important that MTNL has recently come
forward with Insurance scheme wherein premium is paid by MTNL.
·
When CMD and many of Directors of Boards are
common to both PSUs, it is expected that BSNL Policy issued after MTNL policy
should have similar methodologies including payment of premium, which is
missing in this order.
·
Let us hope that BSNL management makes suitable
changes in the policy and premium of this insurance policy is paid/adjusted by
BSNL and employees are not compelled for its payment from salary.
30
JUL 21: AD Staff A Mumbai published the stay particulars of JEs
working in different SSAs of Maharashtra Circle. Letter <<<>>>
·
This is as per the request made by SNEA MH to
CGMT MH and CE Civil Mumbai who is looking after review of the transfers orders
kept in abeyance since last two months.
·
Nowadays JE, JTOs and SDEs are counted together
in long stay list for transfers, but among JEs there is different in
recruitment due to changes in Recruitment Rules. Some JEs are recruited in SSA
Cadre and some are recruited in Circle Cadre.
·
The JE recruited in SSA Cadre cannot be
transferred to other SSA except he/she request under Rule 8/9 but JEs recruited
in Circle Cadre can be transferred from one SSA to another SSA as that of
JTOs/SDEs.
·
While counting in long stay, the JEs of SSA cadre
were also shown but were not transferred and hence there was confusion among
the other JEs and JTOs/SDEs about their correct position in long stay list.
·
Now it is clear who is JE of SSA Cadre and who is
from Circle cadre and accordingly one can analyze his/her correct position in
combined long stay list of JEs/JTOs and SDEs and decide on giving not giving
options/request for transfers.
30
JUL 21: AGM Pers BSNL CO issued transfer orders of SDEs who have
completed all India Hard Tenure station wherein Shri. S.V. Kandalkar, is posted from J&K Circle to Maharashtra Circle. Letter <<<>>>
30
JUL 21: DGM Legal Mumbai issued transfer orders of JTOs/SDEs from
Non-Tenure to Tenure stations against cancellation orders issued on genuine
grounds requests from Individual. Order <<<>>> Cancellation <<<>>>
30
JUL 21: DGM Legal Mumbai issued fresh orders for looking after
arrangements for SEE Nagpur wherein Shri.
A.B. Ingle, is again given responsibility of SEE
Nagpur. Letter <<<>>>
30
JUL 21: DGM Legal Mumbai issued relieving orders of SDEs from
different SSAs of Maharashtra Circle to J&K Circle as per their recent
transfer order issued by BSNL Corporate Office. Some of these SDEs were under
transfer within Maharashtra Circle, but were not relieved and their order
within MH Circle is also cancelled and they will be directly relieved to
J&K Circle. Letter <<<>>>
30
JUL 21: AGM Pers BSNL CO issued second corrigendum to the JTO to
SDE Promotions wherein the working Circle wrongly mentioned in the JTO to SDE
Promotions orders issued recently were shown wrong and now same are corrected
for 92 SDEs. Letter <<<>>>
·
Earlier just before week names of 80 executives
were deleted from promotion orders due to different reasons and now circles of 92
SDEs are changed.
·
As this order was issued in unnecessary hurry and
without going to much details of correctness of data during specific period
when window for membership change was open just to bring more decision among
executives among different association many more corrigendum are expected in
days to come.
30
JUL 21: DGM HR Mumbai endorsed BSNL CO letter for conducting post Audit of Pay fixations done in
Circles/Units on account of promotion, upgradation and pay revision by Finance
wing officer of the rank of AGM/CAO and
above who is not connected with the channel of submission of the pay fixation
related works. Letter <<<>>>
30
JUL 21: AGM MMT BSNL CO issued orders for uploading the experience
certificates issued to contractors with relevant details on link given for same
on BSNL Intranet Portal. Letter <<<>>>
Letter
further states that while issuing experience certificate
intrinsic details of contractors i.e. PAN, GSTN, Address of Works/ Registered
office, specific details of work done,
period in which work executed and performance of contractor are invariably
incorporated.
30
JUL 21: PGM CSC CFA BSNL CO issued orders for new initiative about
paperless CSC working which will help for LL BB connection where landline Service
requests, modifications, NPC & shifting etc shall be done through OTP
validation for collection of mandatory documents & CAF via Electronic Mode,
as a complete paperless activity. Letter <<<>>>
30
JUL 21: AGM Pers DPC BSNL CO writes Circles for completion of e-DPC
works of Quarter April to June 2021 latest by 31/07/2021 and to intimate any technical issues/difficulties faced in
conducting e-DPC, if any, for improvement of the e-DPC platform. Letter <<<>>>
26 JUL 21: Meeting with Shri. Aman Jaiswal, CE Civil Mumbai and
Ex GM HR Admn Mumbai: On 24/07/2021, SNEA delegation consisting Shri.
M. N. Kotambe, ACS SNEA MH, Shri. Abhay Kesarkar, JS CE
SNEA MH and Shri. M. S. Adasul, CS SNEA MH had
meeting with Shri. Aman Jaiswal, CE Civil
Mumbai and Ex GM HR Admn Mumbai to discuss different pending HR
issues and also issues related to Civil wing. The detail of discussions is as
follows.
1.
Request transfers of Executives in Civil Wing:
We have
requested for consideration of request transfers of executives in Civil wing.
CE Civil Mumbai informed that he is on the job and is giving final shape.
He informed that there is acute shortage of executives in Civil Wing
Maharashtra and along with requests he will be issuing some transfers to fill
vacant posts by keeping at least one SDE/JTO Civil in each SSA. He added that
when he is having acute shortage, the transfers are being issued out of
Maharashtra and he has to again think on rearrangements. He cleared that he is
giving final shape to rearrangements and transfer orders of Civil wing JTOs and
SDEs giving consideration to maximum requests as well as for filling vacant
posts will be issued very shorty.
2.
Restructuring of Civil wing Executives and its
impact on rearrangements proposed: We have drawn
attention of CE Civil on the revised and latest restructuring norms proposed by
BSNL CO. As per this justification, there is need of more executives of Civil
wing in Maharashtra Circle and accordingly there is more need of executives in
different BAs and SSAs. He agreed to concern expressed by him and there is need
of more executives of Civil wing in many of BAs/SSAs, finally it is subject to
availability of executives. Though justification will be more for all cadres of
Civil wing, the availability of total number of executives of that cadre even
by considering look after arrangements is important. He assured that if some
more number of executives are posted to MH Circle, the posting as per norms
will be taken care, but at present it is not possible and he has to manage show
among available executives and hence some transfers under rearrangements are
must. We requested to keep it minimum
and he responded he has kept it minimum and at least one Executives for each
SSA in case of shortage is the proposal he is making and final decision on it
will be taken by CGMT MH circle.
3.
Status of transfers to Fill Vacant posts in
SSAs having shortage of executives: We have informed him that we had meeting with GM
HR Admn Mumbai for knowing status of review of transfers, but he has informed
that he is not having any update on it and directed us to discuss this issue
with us. CE Civil Mumbai responded that it is known fact that as per
instructions of CGMT MH, the review of transfer orders kept in abeyance and its
restoration is being done by him and he is on job. He updated that he has
scrutinized all the options received and also decided list of longest
executives from SSAs who are now due for transfers to SSAs having shortage of
executives. No matter is being reviewed for consideration of requests of
longest stayed executives who are having wards studying 12th
Standard, having immunity from Transfer and also have requested for retention
on rounds of critical illness. He added that it is matter of day or two and he
was supposed to complete it by end of this week but DG legal is on leave. He
informed that CGM Sir also is reminding him for early restoration of all
Transfers and hence is has to complete this work early in this week.
4.
Additional options for filling vacant posts
and actual dislocation of executives: When we asked about probable dislocations of executives,
he added that total figure is much reduced in this review process and many have
opted for the nearby or suitable SSAs and hence his work of rearrangements has
been reduced. But Shri. Jaiswal CE Civil Mumbai added that after giving
consideration to all options at own cost till there is requirement of
executives at following SSAs as many of executives have not yet given option or
if given any option, it is for SSAs already having excess executives and this
cannot be given consideration as they are due for transfers from excess to
shortage SSAs on basis of their long stay.
He specifically shared with us that till there is requirement of total
38 executives. He also shared SSA wise break up of requirement in different
SSAs i.e. Beed: 07, Buldhana: 04,
Nanded: 03, Parbhani: 06, Satara: 03, Solapur: 08, Osmanabad: 06, CNTXW at
Akola: 01, CNTXW at Pandharpur: 01. He
mentioned for these many vacant posts, no options are received and hence 38
executives from the SSAs having excess executives will be transferred and
posted randomly with preference to nearby SSAs. He also shared the SSA wise
break of total 38 executives to be transferred in this phase viz. Amravati: 02,
Bhandara: 08, Kalyan: 05, Nagpur: 12, Nashik: 06, Pune: 05. We have narrated
that there are chances of getting some more options and asked him about its
consideration. He added that matter is already delayed and CGMT MH has directed
to complete it at the earliest and asked us to submit additional options if
any. We informed that we have shared entire list of options to these SSAs to GM
HR Admn Mumbai including list of request for excluding names from transfers on
educational grounds, immunity and medical grounds. We also added that we will
again have review of options submitted and left out among longest stayed
executives from SSAs having shortage of executives through our DS and if any
fresh option are given, same will be shared on Monday. We also informed that we
will give wide publicity of left out vacant post among executives due for transfers
and if anyone is ready to give option, we will ask them to send it AD Staff A
Mumbai by email or what’s app or we will share it by hand. Shri. Jaiswal CEC
Mumbai informed that it will be supportive to him but he cannot give more time
and options if any as fresh may be given by individuals latest by Monday and
assured to give consideration to all such options received. In conclusion of discussions on this point he
firmly assured that as majority of work of review is over, he has decided to
finish remaining works by this week itself but he could not finalize it as DGM
legal is on leave but assured that it will be completed by mid of next week and
restoration orders for filling vacant post of in Shortage SSAs with required
changes will be issued accordingly.
5.
Posting to SSAs having less vacant post but
more options: We have discussed issues about SSAs having less
vacant post and more options and specifically about posting to Circle Office,
Mumbai. CE Civil Mumbai informed that in such cases the request from the
executives with highest stay will be given consideration to the extent of
vacant posts. In case of Circle Office only three posts are vacant and two JTOs
on deputation having joined Circle Office and hence net vacancies at Circle
Office has reduced. As such, though more than 25 options are available for
Circle Office, only few or may be nil options for Circle Office will be given
consideration. The executives in long stay will be posted to other SSAs having
vacant post due to shortage. The request of other executives to Circle Office
who are not in long stay list of SSAs having excess executives and executives
from other SSAs will be given consideration in one to one request transfers in
next phase.
6.
ERP relieving of executives from tenure stations: We conveyed thanks
for restoration of Tenure station orders in tune with the transfer policy
guidelines. We also conveyed that SSAs like Sindhudurg, Goa, Gadchiroli have
relieved certain executives but till many are not relieved. The executives who
have completed tenure and not yet relieved are facing hardship due to delay in
relieving and they are worried as their relievers are not relieved and there is
uncertainty on their joining and hence there is unrest. Further the date given for ERP relieving is
already over and in last meeting CGMT MH has given target date of this week end
for their relieving, but same is not being followed. Shri. Aman Jaiswal CE
Civil Mumbai informed that there is issue as the executives who are yet to be
relived are from SSAs which has already acute shortage. The SSAs like Solapur
have relieved some executives and asked time for relieving of remaining
executives as they are facing problems for handing over charge as reliever. As
such it was decided by CGMT MH that first orders for filling vacant posts will
be issued and later as immediate steps the process for ERP receiving of all
left out executives including executives from tenure station will be taken
care. We requested for early action on it and He assured for issuing orders for
ERP relieving by end of coming week.
7.
Restoration of request transfers from
Non-Tenure to Non-Tenure SSAs: We have drawn attention of CE Civil towards the
fact that since request transfers are kept in abeyance, the period of more than
one and half month is passed and there is no sign of immediate restoration of
request transfers. Some of them are relieved by their SSAs and have joined in
transferred SSAs, but in majority of SSAs the executives who were under
transfer as per their requests are not relieved. Some of them have shifted
family as per order issued and are facing hardship as orders kept in abeyance
are not restored. Shri. Jaiswal CE Civil Mumbai informed that he agrees that
there is delay but by considering issues in review of orders for filling vacant
posts from calling for options and its analysis, more time has been taken in
this orders. But for request transfers the policy is for one to one posting and
it will not take time more than weeks. Also majority of requests are already
issued and it will be matter of just posting substitute from SSA to which
request is pending. He assured that in coming week the Excess to Shortage
orders and ERP relieving of Executives left out in tenure orders will be
completed and by next week the request transfers from Non-tenure stations will
also be restored.
8.
Publication of revised long stay list of JEs: We have informed
that though it was assured in the meeting held with CGMT MH to publish long
stay list of JEs by excluding names of JEs who cannot be transferred out of
SSAs being SSA Cadre. CE Civil Mumbai informed that he has already directed DGM
Legal Mumbai to publish list of JEs as discussed. He added that today he is one
leave and Monday he will direct him to publish the SSA wise long stay list of
JEs. But he added that there is no much impact on overall process and very few
number of JEs are not eligible for transfer out of SSA and majority can be
transferred out of SSAs. But he assured that as discussed the list of long stay
of JEs will be published on coming Monday.
9.
Confirmation of Excess shortage strength of
SSAs on basis of actual working of executives: We have drawn
attention of CE Civil Mumbai towards the difference in actual working figures
of executives and figures shown working by staffs section. We requested that
association has already shared the details of Nashik and Kalyan SSA and how
there is difference. Shri. Jaiswal CE Civil Mumbai informed that he has checked the figures and has shared all
details with us. In Nashik SSA, there are total 105 Executives i.e. 08 DEs, 36 SDEs, 42 JTOs and 19 JEs and Two
DE from Circle Tenure stations will be joining Nashik and two DEs from Nashik
will be shifted out of Nashik. Two JTOs are under tenure transfers. Total
justified at Nashik SSA are 94 (92 SSA+ 02 Mob). Thus out of 105 working
executives 94 are justified and hence 11 are due for transfers. We have
narrated that as per calculations given by DS Nashik, the total working figure
is about 98 and not 105. We assured to confirm the figures again and Talley it
with the figures given. Same is case with Kalyan SSA, as per figures given by
CE Civil total 76 Executives are working in Kalyan SSA and its break up is DGM
: 00, DE : 00, SDE 22, JTO 34 (33 SSA+ 01 Mob) and JEs 20. Further as per orders pending DE: 02, SDE:
01, and JEs: 02 will be joining Kalyan
SSA as per orders pending from tenure station. Thus total strength of Kalyan
SSA with transfers pending goes to 81 and thus there are five excess
executives. After understanding figures of additional posting from tenure
stations, we have also seen that there is no difference. But as the detailed
list of JTOs was not available with us for confirmation, we have assured to
discuss the details shared by CE Civil Mumbai and get its confirmation from DS
concerned. CE Civil Mumbai informed that
he has readily available data of executives and hence he is firm about the
excess shortage shown. We have asked for exclusion of names of executives who
are absconding, under transfer to other Circles and due for rule 8 transfers.
He informed that all such names are excluded and these are figures after
excluding these names. We assured to get the details shared by him confirmed
with actual working figures from DS concerned and if these figures are matching
we do not have any issue in it.
10.
Review of Requests transfers of Account wing: We have requested
CE Civil Mumbai to have review of the Transfer orders of Account wing Officer
and many have submitted revised request and rearrangement is quite possible. CE
Civil responded that the tem f staff section is focused on the excess to
shortage and tenure station orders of Telecom wing executives and hence till
review of Account wing transfers is not completed though many of the request
are received. He assured that very shortly this review also will be completed
including request transfers and transfers from SSAs having excess executives to
SSAs having shortage of executives. He assured to complete review of account
wing immediately after completion of Telecom wing transfers and maximum within
fortnights period.
11.
Issues created due to Deputation of JTOs from
Electrical wing to Telecom wing: We have drawn attention of CE Civil Mumbai
towards the critical issues faced by some Electrical wing JTOs on deputation to
Telecom wing. Though these executives are relieved by Electrical wing, they are
not allowed to join by some of SSAs and if allowed to join, then no work
allotted to these JTOs. We have shared copies of letters written by some of SSA
Heads with reason why they are not willing to give works to these JTOs. Shri.
Jaiswal CE Civil Mumbai informed that he has seen such letter and agreed that
there is need of review of orders of JTOs which are issued to SSAs already
having excess executives. He conveyed that these orders will reviewed and he
has already directed DGM legal to take care of it and firmly assured to resolve
it shortly.
12.
Consideration of Request of JTOs in Electrical
wing: We inquired with
CE Civil Mumbai about the status of request transfers in Electrical wing. He
informed that same will be taken care by Electrical wing but CGMT MH has
directed that all works related to transfer posting is to be centralized with
GM HR Admn Mumbai. This time it will be take care by Electrical wing through GM
HR Admn Mumbai. We have narrated two requests of JTO Electricals at Bhandara
and Dhule, who have served for more number of years in these SSAs and were
waiting for their request transfers, but instead of it, they are transferred to
Telecom wing in same SSA. They are facing issues while working in Telecom wing
and also they are in need of transfers as they have served for more period more
than three years in these SSAs. In response Shri, Jaiswal CE Civil Mumbai
assured to look into such cases after discussions with GM HR Admn Mumbai and CE
Electrical Mumbai as these are old cases.
13.
Dispute between Account wing and HR section: We have reminded
him our discussions in the meeting with CGMT MH and requested him about
resolution of the ongoing dispute among Account and Telecom wing and clear
pending works like confirmation of JAOs and some individual cases pending for
long time viz. case of final approval of resignation of Shri. Altab Malik then
JAO Mumbai who has resigned BSNL before one and half year, but till formal and
final approval is not issued due to this dispute. CE Civil Mumbai informed that
there was dispute as the files were not officially handed over to HR section
from then FC section and after discussions in meeting with CGMT MH he has
directed DGM legal to get the issue settled. He assured that all pending cases
held up due to this dispute will be settled shortly and directed us to remind
in Monday so that same can be taken care.
14.
Delay in releasing salary of AO working on
deputation and no action on part of DGM legal Mumbai: We have narrated
case of Shri. Pankaj Marathe, AO who is deputed from Dhule to Pune by Account
wing for special activities and his salary is not withdrawn as his ERP in
transferred to Chandrapur as per HR section order and he is working at Pune as
per account wing order. The file has been sent to DGM legal since last two
months and as per his say the deputation order is not issued in consultation
with his office and hence he will not take action about it. Due to this Shri.
Pankaj Marathe AO is working without Salary at Pune SSA for last three months
and facing hardships and issues. Shri. Jaiswal CE Civil informed that he is
aware of case of Shri. Marathe and has already instructed DGM legal to settle
the issue and if not yet settled , he will see that it is settled in coming
week after joining back of DGM legal from leave.
15.
Pending no dues certificates of Retired
Executives: We have drawn
attention of CE Civil Mumbai that there are some cases wherein no dues
certificate is issued by Estate section Mumbai and there is undue delay in
issuing certificate. Earlier we have brought these issues to the notice of DGM
Admn Mumbai and even though he has assured for same, no final action was taken
by JTO Estate and good amount is deducted from the dues of retired executives
and then individual have to run from pillar to post for getting refund of
deducted amount. Now also 3-4 cases are pending and needs no due certificate
issued before end of this month otherwise, deduction will be implemented and we
specifically narrated case of Mrs. Jerine AO Mumbai VRS Optee. CE Civil assured
that matter will be taken care so that no one suffers from undue
deductions.
16.
Issues related to Fake caste complaints: We have drawn
attention of CE Civil about the issues faced by the executives against whom the
complaints of fake caste are received and MH Circle has started action against
these executives and non-executives. CE Civil informed that actually he want to
discuss this issue and it is better that SNEA has raised this issue. He made it
clear that his name is being propagated by some units/individuals as he is
against these employees who are facing complaint of fake caste, but fact is
that he was never against anybody and there is no reason for him to act against
anybody. He shared some incident about discussions and sms from GS SNPWA Shri.
Jogi and his discussions thereof o issues related Fake cate complaints and said
pendency on part of BSNL Maharashtra Circle. CE Civil Mumbai informed that from
his side matter is open to all and anyone can check the documents issued and
correspondence made by Maharashtra Circle over the period. He clarified that
Maharashtra Circle do not have any separate powers to deal with these cases and
it is working as per directives from BSNL Corporate Office and caste validity
law applicable in Maharashtra State. We have informed him that validity law
will be applicable since date it has been introduced and it will not be
applicable to any cases prior to it. He informed that he fully agrees with the
concern and it should be applicable from date on which law came into force. But
he added that in one of letter issued by then Director HR in year 2017, the
directions have been issued for taking actions accordingly against Fake caste
complaints and hence MH Circle is following these instructions. We have
narrated that Maharashtra Circle should have taken up matter according to the
existence of law and same should have been brought to the notice of BSNL
Corporate Office. He informed that all the issues are repeatedly brought to the
notice of BSNL Corporate Office, but for whatever may be reason, the matter is
not clarified either by BSNL Corporate Office nor it is suitably taken with
DoPT. We narrated that due to this many executives only from MH Circle are
sufferers and all the issues in other circles including WTR/WTP within
Territory of Maharashtra Circle are settled. He informed that the leave
encashment issues were settled by WTR/WTP on priority and now same has been
decided by MH Circle also as per recent guidelines issued by BSNL Corporate
Office. We have narrated that recent guidelines have not given any relief
rather there is addition of condition of indemnity bond which was not
applicable earlier. He agreed to our
say, but asked to take up matter with BSNL CO so that fresh guidelines are
issued and assured that same will be followed by MH Circle. We discussed about
the cases wherein caste certificate is confirmed to be issued by the Issuing
authority and strongly pleaded that at least in such cases there is no fault of
individuals and they should be given relief. There are certain changes in
administrative matters of Maharashtra State and even though certificates for
some castes were issued earlier, same has been stopped at later stage or it is
limited to certain districts and in such case validity at this stage is not
possible as being asked by BSNL. We have narrated that executives who have
rendered services of more than 25-30 years and opted for VRS are specifically
under trouble as their pensionary benefits including provisional pension has
been kept on hold even though Vigilance clearance has been issued and no case
was pending with them on date of VRS. We also narrated that in many cases
provisional pension as kept on hold for last one year and no action has been taken
on it. CE Civil informed that Provisional Pension cannot be kept on hold, but
CCA Mumbai has kept on hold some of the provisional pension and after repeated
requests no list of such cases is given. He informed that till matter is not
brought to notice of his office and list is given, his office cannot take
action on it. We have informed that we have reported case of Shri. Tilwar and
others since last January to Shri. Kadam JTO Recruitment Mumbai but he was
adamant and has deliberately not taken any action in this case as if he is
final authority. After his adamant stand matter was reported to DGM Admn Mumbai
who was kind enough to firmly assure us to settle case of provisional pension
of Shri. Tilwar SDE VRS Nagpur within months period and similar other cases,
but even after seven months have passed no action has been taken and Shri.
Tilwar and many others are suffering without even provisional pension. CE Civil
agreed to concern expressed by us and
directed us to take matter with CCA Mumbai and get list of such
executives/non-executives who are not getting provisional pension and assured
to take immediate action on it within no time. He also narrated that one such
request letter is being written to CCA Mumbai.
We have further narrated the issues faced by executives who are working
and issued charge sheet for no mistake on their part. He added that this is
being done as per directions of BSNL CO and if no action is taken by
Maharashtra Circle, it has been directed to take action against such officers and
hence action has been initiated and few charge sheets are issued and remaining
are being issued will be served shortly.
Many of the affected executives have met him personally and were
requesting for guidance and help but nothing in his hand and matter needs to be
decided by BSNL Corporate office and if required matter needs to be taken
suitably with DoPT for clear guidelines on applicability of caste validity to
cases before Caste Validity law was implemented by Maharashtra State. We added
that if clarification is issued by Maharashtra State that the caste validity is
not applicable for recruitments made before validity of rule will it help these
executives? He informed that he has guided certain officer exactly to get it
issued and this will solve problem of many executives. We added that as per
guidelines the caste validity is to be done within two years of recruitments
and same has been done by BSNL/DoT in about all cases. CE Civil agreed to our
say and informed that as per guidelines issued by the Director HR in 2017, the
caste validity is made applicable for all cases for which fake caste complaint
is received and hence there are issues. He finally directed us to take up
matter with BSNL Corporate Office and /or State Government of Maharashtra and whatever
documents/correspondence made by MH Circle can be made available, but no one
should be under wrong impression that BSNL MH Circle is deliberately is against
them and deliberately troubling these executives. This case has two sides as
affected and complainants and both the sides are pleading their stand regularly
and strongly and hence matter needs to be decided either by competent authority
i.e. BSNL Corporate Office or by State Government of Maharashtra and whatever
guidelines will be issued by them, will be binding to BSNL Maharashtra Circle
to follow and assured for resolution of issues accordingly.
17.
Immediate action for critical Maintenance of
Staff Quarters in Mumbai: We have drawn attention of CE Civil Mumbai on the
critical issues created due to poor or non-maintenance of BSNL Staff Quarters
in Mumbai. We have narrated the critical condition of Buildings and how it is
life threat for employee and their family members residing in these Staff
quarters. We have added that we have received/taken some of videos and
photographs clearing worst condition of Staff quarters wherein there are issues
of structural damages of some of buildings. We have narrated that slap of
terrace has fallen on lifts and lifts has been closed in high rise building and
extreme hard conditions are being faced by residents. We also added that this
shabby condition of building is reason for delay on part of other PSUs who have
submitted proposal for taking on rent vacant BSNL staff quarters. The team of
HPCL visited recently and have expressed issues about the shabby condition of
BSNL staff quarter at Dadar and same is case with Wadala. The condition of
staff quarters at Borivali, Santacruz, Andheri, Powai and Bhayculla is also not
good and there are certain issues of maintenance which needs immediate
attention. Shri. Jaiswal CE Civil Mumbai
agreed to the serious concern expressed by SNEA and the critical condition of
BSNL Staff quarters is really worsening as no even minimum required maintenance
is being done. He added that BSNL is getting good revenue under CROP Policy and
same could not be done for want of funds.
He informed that this matter is already brought to notice of CGMT MH
Circle and he also has directed him to take immediate action for maintenance of
all Staff quarters in Mumbai. Accordingly, his office has prepared estimates of
regular maintenance of Santacruz Colony and BSNL Admn Building of Santacruz and
same are already approved. The similar action is being taken for all other
Staff quarters is being started and during the process issues of funds is
raised by Finance Mumbai and process is moving further slowly. He added that in
regular maintenance works like Drain line works / minor water leakage arresting
/Taps or Doors carpenter works are taken care. But for major civil works like
structural repairing including major wall /beam cracks /major water leakage
from ceiling /walls like lift rooms slab plaster collapsed etc comes under
capital works/special major repairing works. For these capital works special
Project related WBS /budgeting funds is required and request for same is being
sent to BSNL Corporate Office. He further added that he has received photos and
videos of maintenance and structural issues of Dadar and Wadalba colony about
recently happened incidence and accordingly
SE Civil and EE Civil visited sites and work of preparations of
estimates as per their observations is under process. As per meeting with GM
Finance for Civil and Electrical maintenance presently common funds are
available under different heads /nodes like Building Repairs & Maintenance,
Building works and under this some funds are booked but expenditure has not
been carried out and there is need of review of the booked funds but not
utilized. His office is reviewing this issue in consultation with finance wing
and special funds request will be sent to BSNL Corporate Office and special
approval thereof. For Mumbai area itself at least Rs Five crores are required
for such urgently needed structural repairing works. He added that as per the estimates
only for minimum required maintenance of all colonies immediately Rs One Crores
are required and for structural repairs and other major works more funds will
be required. He added that CGMT MH has assured to take up matter with BSNL CO
for availability of funds. He also added that matter is also discussed with
HPCL for providing funds for repairs as advance deposit and same can be
adjusted against the rents. CE Civil further added that he is in touch with GM
Finance Mumbai and he also has assured to take up matter with BSNL CO for funds
for repairs works of the BSNL Staff quarters all over Mumbai. CE Civil Mumbai
firmly assured that he is very keen on such issues and action will be taken as
per availability of funds and works will be taken care on priority. He directed
us that association also should to take up matter with BSNL CO for allotments
of funds so that issues can be taken care at the earliest.
18.
Delay in allotment of Staff quarters in
Mumbai: We have narrated
that there are some request pending for allotment of staff quarters and more
time is taken in processing applications by SDE Estate and the executives in
need of transfers are facing issues. Shri Jaiswal CE Civil Mumbai informed that
this work has been transferred to him but no AGM is transferred and only SDE
alone with staff is transferred. He added that there is huge work in Estate
section and it is difficult to manage the works with single SDE. He added that
he has already discussed with CGMT MH for giving one additional JTO/SDE for same
and he has assured to post one ore hand so that all such issues can be taken
care. He informed that there is good revenue being generated from the rented
Staff quarters under CROP policy and there is need of one more hand for taking
all issues including accounting of rent payable and paid by Retired persons. He
informed that there is delay in processing requests, but assured that steps
will be taken for making the process of allotment of staff quarters fast. He
also asked us to remind such pending issues fresh in next week and we assured
for same
We have
very fruitful discussions for more than one and half hour with Shri.
Aman Jaiswal, CE Civil Mumbai and Ex GM HR Admn Mumbai and we
have shared details feedback to him and he also has shared the relevant information
even on cases by cases with progress of pending HR issues as per directives of
CGMT MH Circle. In conclusion of meeting we have conveyed him sincere thanks
for to depth discussion on all issues and assured to give additional feedback
as per discussions and he assured to take care of all issues brought to his
notice in time and directed us to remind specific pending cases in next
week.
23
JUL 21: AGM Pers BSNL CO issued transfer orders of SDEs from and to
All India hard Tenure stations wherein one SDE is posted to CNTXW Circle and
five SDEs are posted to J&K Circle as per the request given by individual
SDEs. Letter <<<>>>
23
JUL 21: DGM HR Mumbai writes to SSA/BA/vertical/Unit Heads for
completion of pending e-APRS of Year 2019-20 with list of executives whose e
APRs are pending. Letter <<<>>>
23
JUL 21: DGM NB BSNL CO issued rrevised Open Policy for monetization of co-location facilities and other
telecom infrastructure of BSNL with request to Circles to explore Business
opportunities. Letter <<<>>>
23
JUL 21: AGM Estt BSNL CO issued corrigendum to holidays to be
observed in Year 2021. Letter <<<>>>
23
JUL 21: AGM Pers BSNL CO issued cancellation of SDE promotion
orders in respect of 80 executives recently shown promoted as JTO to SDE as these
executives are either promoted earlier, resigned from BSNL, expired or retired.
Letter <<<>>>
·
As these promotion orders were issued in hurry
and mainly in late night to early morning there are such mistakes and
corrective action has been started now.
·
Due to this, hundreds of JTOs are deprived from
their promotion and it is reason for mass unrest among JTOs of recruitment year
2008.
·
Hopefully these vacant posts will be filed up by
giving SDE promotions to next seniors in JTO to SDE seniority list.
18
JUL 21: DGM Legal Mumbai published data of options/willingness received
by Staff section Circle Office Mumbai in response to options called from
executives of Telecom and Account wing having excess executives to fill up the
vacant post in SSAs having shortage of executives in Telecom and Account. Letter <<<>>>
·
SNEA MH has requested to publish this data of
options received with GM HR Admn Mumbai and CGMT MH and accordingly this data
is published.
·
In the start of this letter it is clearly
mentioned that these are options received in reference of letter dated
02/07/2021 which is clearly mentioned under reference.
·
Accordingly, this data should have been limited
to the options received for vacant posts in SSAs having shortage of executives
and not entire data received after 02/0/2021 as done here.
·
It is crystal clear that either the own office
letter is not clearly understood by DGM Legal Mumbai , or this is one more
attempt to create confusion and unrest among the executives as in this data
options given to SSAs having excess executives are also included.
·
Disclosure of such partial options have created
confusion and unrest among executives whose request transfer are already given
consideration and orders are also issued but kept in abeyance on 02/06/2021 for
review as per transfer policy guidelines.
·
It is but natural that there are chances of
missing any individuals request in such huge work and hence to have corrective
action, we have requested to publish the data of options received so that one
can understand where his/her option has been reached in Staff section Circle
Office or not and if reached where same is taken into consolidated list being
considered for giving choice posting or not.
·
SNEA MH has requested for publishing SSA wise
long stay list of all executives including JEs, but after elaborate
discussions, it was finally decided that only long stay data of JEs will be
published as there are two categories of JEs and only JE recruited in Circle
Cadre can be considered for out of SSA transfers on long stay basis and JE
recruited in SSA Cadre cannot be transferred out of SSA on basis of long stay.
·
CGMT MH has firmly assured for publication of
long stay data of JEs and directed GM HR Admn Mumbai for same, but same it not
yet published and hopefully it will be published on Monday.
·
Certain Officers in the Staff section were never
interested to publish data of options received and may be with such negative
attitude and reluctance data is published with casual approach which has
created more confusion and unrest among concerned executives as immediately on
publication of data, DS and COBs of SNEA MH have received many queries about
it.
·
Only plus point in this published data is that
this time different background colors are given to certain options, but nothing
has been mentioned about colures in this letter, creating more confusions.
·
As per letters, discussions with CGMT MH and GM
HR Admn Mumbai time to time on this subject, it was supposed to publish data of
options only to SSAs wherein executives are shown as “IN” in the letter dated
02/07/2021. Copy <<<>>>
·
It has been firmly decided as policy matter that
executives in Circle Long stay posted to tenure stations will be given option
only for change of SSA within Tenure stations but not to any other non-tenure
stations, but such options are also published in this list that to be SSAs
having excess executives, which is totally wrong and misleading.
·
Executives and JEs who have given more than one
option, any of the options may be given consideration as per availability of
posts and options received thereof and if one has given option for more than
one place, he/she should be ready for posting at any of the SSA for which
he/she has opted.
·
It can be seen that Ahmednagar is having five
vacancies of JE/JTO/SDEs and total five options are received for Ahmednagar SSA
and request of all these executives will be given consideration.
·
But for Beed SSA where 10 post of JE/JTO/SDEs
has not received even single option and hence the executives from SSA
having excess executives i.e. SSAs against which executives are shown
excess/Out will be posted to SSAs like
Beed where no options are received or option are received less than the vacant
post.
·
For Satara SSA there are 10 post JE/JTO/SDEs
vacant , but only nine options are
received including second, third and fourth option and all who have
opted for Satara will be posted to Satara and one more executives from nearby
SSA will be posted to Satara SSA.
·
In Akola SSA two post of JE/JTO/SDEs are vacant
but options received are four and hence only two options will be given
consideration.
·
In Jalna SSA only four post are vacant and total
nine JE/JTO/SDEs have opted for Jalna SSA and here requests of only four
JE/JTO/SDEs from nearby SSAs will be given consideration.
·
In Amravati SSA there is no vacancy but seven
executives have submitted options for Amaravati SSA/Mobile and hence there is
no chance of posting any executive in this order for transfer of executives
from Excess SSA to Shortage SSA. Same is case with Gadchiroli, Pune, Bhandara,
Nagpur etc SSAs.
·
For Circle Office Mumbai there is shortage of
three JE/JTO/SDEs wherein two JTOs have already joined resulting only one
vacancy in Circle Office Mumbai, but total 29 options including third and
fourth options are received for Circle Office Mumbai out of which only one will
be given consideration in this orders. The chances of posting of executives who
have given option to Circle Office is about ‘Nil’. But if they are not in long
stay list their request will be given consideration to Circle Office
Mumbai. In this case, same number of
JE/JTO/SDEs from Circle Office Mumbai will be transferred to the SSAs from
where the request are shown towards the Circle office Mumbai. Same is case with
Nashik, Pune, Amaravati Aurangabad,
·
But if these executives are not transferred in
long stay list to SSAs having shortage then at later stage their request may be
given consideration on one to one basis as substitute.
·
We have already discussed the matter for posting
of executives who have requested at own cost request transfers from Shortage to
shortage SSAs and same will be given consideration in these
orders and excess executives from excess
SSA will be posted to these SSAs.
·
Accordingly all executives who are coming
under zone of long stay transfers may have their own analysis of the
shortage/excess of executives for which they have opted, their working SSA and
his /her position in long stay list and go ahead with options given by them.
·
It may be please noted that requests/options with
own cost for SSAs having options more than the vacant posts will be given
priority over the company cost request/option.
·
Though it not mentioned in this letter, the
executives who have opted or whose options are wrongly noted in this list are
requested to represent their grievances by signed copy representation addressed
to GM HR Admn Mumbai and send it by email on adstaffamhco@gmail.com for JE/JTO/SDEs
cadres and adstaffbmhco@gmail.com
for AGM/DGM cadres and its copy at agmstaffmh2018@gmail.com
for all cadres from JE to DGM.
This exercise many be completed within day or two as the review to fill
vacant post in SSAs having shortage is at final stage and orders will be surely
issued in this week itself.
·
The executives from SSAs having excess executives
who have once completed Circle tenure and now opted for not posting to tenure
station second time , will be under zone of transfers to non-tenure SSAs and
hence they will have to opt accordingly or be ready for posting at any of the
place.
·
The executives who are in long stay and having
children studying in 12th Standard in year 2021-22, will get
retention for period of one year and if they apply before transfer orders are
issued, their names will be excluded and hardship faced after issuing orders
will be saved.
·
Others who are in long stay of SSAs having excess
executives and not yet opted for any SSA and their name is coming under zone of
transfer as per excess executives or as per incoming request to their
SSAs/Units may also have analysis of vacancy positions and incoming requests to
their SSAs/Units and decide about submitting options or be ready for company
cost transfer at any SSA/Unit having vacant post in this phase of review of
transfers to fill vacant post at shortage SSAs or in next phase of review of
request transfers which are kept in abeyance.
·
Till any of SNEA member has any issue, he /she
may contact DS SNEA concerned and/or to any of the COBs of SNEA for
clarification required on any point of transfer policy guidelines and act
accordingly in time to avoid any transfer at non-suitable or odd place.
18
JUL 21: AD Staff A Mumbai published data of options/willingness
received by Staff section Circle Office Mumbai in response to options called
from executives of Account wing having excess executives to fill up the vacant
post in SSAs having shortage of executives in Telecom and Account. Letter <<<>>>
·
As per persuasion by
SNEA MH with GM HR Admn Mumbai and CGMT MH and as rightly quoted in first para
of this letter, the options of only JAOs/AOs from excess executives to SSA
Having shortage of executives should have been published.
·
These options were
called only for filling vacant post JAOs/AOs in specific BAs like CO Mumbai,
Pune, Nanded, Chandrapur, Satara and Kolhapur BAs and one or two vacancies in
other BAs. Copy <<<>>>
·
But it is seen that
all the options received by Staff section after 02/07/2021 are added in it and this list seems to be
prepared so casually that in many cases options from same SSA to same SSA are
mentioned without any reason thereof in remark column.
·
Request for other
Circles including Rule 8 and Rule 9 requests are also added in this list. Apart
from this refusal of DGM LA, request to SSAs already having excess JAOs/AOs is
also added in the list.
·
When it is proposed
to shift 40 JAOs/AOs from SSAs having excess JAOs/AOs due to centralized works
at BAs (Except Beed SSA) having shortage practically only 20-22 options are
received and out of that many are to SSAs having already excess executives.
·
There are more
vacancies in Circle Office Mumbai, Pune, Nanded, Satara and Kolhapur BAs and
except Kolhapur no other BAs have received sufficient options.
·
Till any of JAO/AO
from SSAs having excess executives or having incoming request transfers may
have analysis of the shortage /excess of decide on submitting options
accordingly or be ready for posting at any of the BA having shortage of
JAOs/AOs.
·
The restoration of
transfer orders for posting JAOs/AOs from excess SSAs to shortage SSAs which
are kept in abeyance is going on and most probably orders for filling vacant
post in SSAs having shortage of JAOs/AOs/CAOs will be restored in this week
itself.
18
JUL 21: DGM HR Mumbai writes to BA/SSA/NRU Heads calling for the
documents required for confirmation of 132 JAOs and 119 JTOs throughout
Maharashtra Circle including Non-Recruiting Circles. Letter <<<>>>
·
This work of confirmation of JTOs and JAOs is
delayed since VRS 2019 and rearmaments in sections, officials and officers
thereof.
·
SNEA MH has been pursuing this issue continuously
and in recent meeting with CGMT MH on 16/07/2021, we have again raised this
issue and elaborated CGMT MH about undue delay in confirmation and dispute on
handing over files among FC and Staff section wherein CGMT MH has directed GM
HR Admn Mumbai to look into this matter and get it resolved.
·
With persuasion of SNEA MH, earlier also
information called vide letter dated 24/10/2020, Copy <<<>>> and in response data information of about 40
Executives has been received by HR section and till information in respect of
JTOs/TOs left out in the earlier letter and in this letter issued today is yet
to be received.
·
The confirmation of 40 JTOs/JAOs can be issued at
any time but with view that confirmation of all can be issued together in one
stroke and hence the information about left out JTOs/JAOs is now called by
giving time of one week to all units.
·
Some of JTOs/JAOs working in other Circles but
recruited by MH Circle, but not yet confirmed are also requested to take up
matter with their SSA/Circle and send details required for their confirmation
by MH Circle to AD HRD Mumbai. The confirmation orders of all such JTOs/JAOs if
not issued till today will be issued by MH Circle.
·
Though it is not mentioned in letter, the
data/information with attested copies of concerned documents are to be first sent
by email on adhrd2018@gmail.com and agmesttmh@gmail.com and hard copies are
to be sent by post to Shri. M. R. Snap, AD HRD, A wing, 4th Floor, BSNL Admn Bldg., Santacruz Mumbai 400454
concerned offices are sending all relevant documents at the earliest to HR
section Mumbai.
·
All DS SNEA are requested to take up matter with
SSAs/BAs /NR Circles concerned and see that information in respect of all these
JAOs/JTOs and others who are not yet confirmed is sent within period of one
week.
18
JUL 21: DGM HR Mumbai writes to BA/SSA Heads calling for the
information required Time Bound Promotions
in respect of executives whose TBP e1 to E2, E2 to E3 is due in second half of
Year 2021. Letter <<<>>>
17
JUL 21: Jt GM
Pers BSNL CO writes to all Circle/Unit Heads giving timelines for corrections in earlier APRs uploaded in ESS
Login system Letter <<<>>>
The APRs of old period i.e. APRs
before introduction of e-APRs, are uploaded in ESS Portal and concerned
executives have to check details of grading’s shown in APRs through ESS Login
and represent to GM HR MH Circle for discrepancies if any latest by 31/07/2021
and all such representations are to be disposed off latest by 15//08/2021.
17
JUL 21: AGM Pers BSNL CO issued transfer orders of AGMs from and to
All India tenure stations wherein Shri.
K.D. Gangurde, AGM J & K Circle who has completed his tenure at J&K Circle is posted
back to MH Circle and Shri. C.G. Patil, AGM CO Mumbai is
posted to J&K Circle as substitute. Letter <<<>>>
17
JUL 21: AGM BW HR BSNL CO issued transfer orders of SDE Civil
wherein Shri. V. K. Kumbhar, SDE Civil Solapur is
posted to Karnataka Circle as per his own cost request. Letter <<<>>>
17
JUL 21: DM T&C CM BSNL CO issued circular introducing new facility free night data
(from 0000 hours to 0500 hours) with WFH STV599 under GSM prepaid mobile
services. Letter <<<>>>
17
JUL 21: DGM CNO BSNL CO writes all Circle/Unit Heads conveying
instructions of CMD BSNL for planning for
one air conditioned equipment room in one building. Letter <<<>>>
17
JUL 21: GM NWP BB BSNL CO writes all Circle/Unit Heads for
termination of poor performer FTTH Channel partners who have zero net connections
from 01/11/2020 to 15/02/2021 and issue notice to partners having less than two
FTTH connections. Letter <<<>>>
17
JUL 21: AGM RM BSNL CO issued circular offering the service of bundled Google Nest
Mini/Hub smart devices under annual/biennial/triennial payment option across
selected BSNL’s Broadband (DSL/Bharat Fibre) plans on promotional basis for 90
days . Letter <<<>>>
16 JUL 21: Meeting with CGMT MH Circle to discuss current HR Issues: Shri.
M.N. Kotambe, ACS SNEA MH and Shri. M. S. Adasul, CS SNEA
MH had meeting with Shri. Ramakant Sharma, CGMT MH
Circle on 15/07/2021 at 1730 hrs in his chamber to discuss the urgent HR
issues. The meeting was held in presence of Shri. S.V. Nakhale GM HR Admn
Mumbai and Shri. Aman Jaiswal, CE Civil and Ex GM HR Admn Mumbai.
At the
outset, we conveyed sincere thanks and gratitude to Shri.
Ramakant Sharma, CGMT MH Circle and his
team for Restoring Tenure Request Transfer orders, Giving consideration to
earlier Tenure completed period and choice not work at Tenure station again,
Consideration of all requests for retention on grounds of ward studying in 12th
Standard, calling for Fresh options for Non-Tenure stations, Consideration of
Request for change of SSA in Tenure orders, Cancellation of double transfers to
SSA and CNTXW Circle and for application of Tenure stations for Account wing at
par with Telecom , Civil and Electrical wing. In response CGMT MH informed that
his office trying to give consideration to all the genuine concerns expressed
by SNEA and review has been done as per guidelines on the subject and
discussions held thereof. Details of HR issues discussed are as follows.
1.
ERP Relieving of Executives under transfer
from Tenure stations: We have narrated
difficulties and hardship faced by the executives working at tenure stations as
they are not being relived from Tenure stations even though some substitutes
have joined. We requested for ERP relieving of all these executives as date
given for same has been already over and work of review of orders in abeyance is
delayed. CGMT MH informed that he fully agrees with concern expressed by us and
difficulties faced by executives working at Tenure stations. He added that ERP
relieving it is under active consideration and he has already conveyed
instructions for same. But it is reported by some SSA/BA Heads having acute
shortage of executives that till substitute is posted it will be difficult for
them to relieve these executives under transfer to tenure stations. In
conclusion CGMT MH informed that by next week the orders for filling vacant
posts at shortage SSAs will be restored and then immediately process of ERP
relieving of executives will be initiated and all left out/not relieved
executives to and from Tenure stations will be relived through ERP by Circle
Office Mumbai.
2.
Undue delay in review of request Transfers
from Non-Tenure Stations kept in abeyance: We have drawn attention of CGMT MH
towards unrest among executives who are waiting for request transfers for last
two years and how all are eagerly waiting for early restoration of the already
issued transfer orders. The orders are kept in abeyance on 02/06/2021 and since
then one and half moth passed and only Tenure station orders are reviewed till
now. CGMT MH expressed that he has
repeatedly instructions GM HR Admn Mumbai to complete review fast, but officers
under him are taking much time. He personally wants to complete review very
fast and give final shape by restoration of transfer orders kept in abeyance.
He firmly directed GM HR Admn Mumbai to take lead and work on the review of
transfer orders to fill shortage of executives by coming week and also complete
review of request transfers from Non-Tenure stations by next week.
3.
Issues due to Calling Fresh Options without
giving working Strength: We have drawn attention of CGMT MH Circle towards
the issues created by publishing vacancy position in non-transparent manner
wherein working executives, justified executives and excess shortage executives
are not shown SSA wise, but in similar approach as happened earlier, options
are called just by showing In and Out. We pointed out that in last meeting CGMT
MH has assured to publish it by showing details and we have shared the earlier
format published for it. CGMT MH informed that he has personally worked on
strength of executives by discussions with all SSA/BA Heads. He added that
after this publication of data, many of SSA Heads and SNEA has raised concerned
and accordingly he has taken care and reduced number of executives to be
transferred In and out from all SSAs. He added that now again there should not
be dispute created at this stage. We have elaborated him that we are not
creating dispute, but we have calculated proposed SSA wise executive strength
for all SSAs and it is seen that the figures of working executives do not match
with the figures considered as working by staff Section. Copy <<<>>>.
He firmly
appealed to believe him as CGMT MH as he has taken efforts to keep transfers
minimum and has elaborated the details to all BA Heads. CGMT MH expressed that
no one wants transfer and everyone wants to be at the same place and he is
getting calls for transfers every now and then from individuals, form political
leaders, MPs/MLAs and this is not good culture and all have to be ready for
transfers. Being Government servant, one has to move on transfers and help
others who are already working with much difficulties due to shortage and SSAs
having excess manpower has to spare minimum number of executives. In support of
this say, CGMT MH has shown the details of exercise he has done for counting
and calculations of SSA wise Executives strength. We responded that we never
oppose transfers, but our request is to issue transfers in transparent manner
and executives are ready for transfers if it is issues under uniform criteria
and as per policy which is missing here. We requested that whatever figure he
has decided as working strength may be published and we will not object on it
to review, but for transparent working and mainly to have confidence among all
executives, it is required to publish the justified strength, working strength
and excess shortage. We have again shared copy of such data published earlier.
Copy <<<>>>.
We have narrated that such exercise was done
regularly in earlier days at the level of AD, but it is stopped now. CGMT MH
asked how it will be helpful at this stage as he has already given
consideration and accordingly data is published. We have narrated some
discrepancies in the calculations and elaborated that we have seen that in some
of SSAs the excess executives are shown just because the working strength is
counted wrongly. We also added that if the justified executive strength is
taken into consideration, then the figure shown as working is higher than the
practically working executives. We have narrated classic example of Nashik SSA,
where total 107 executives are working, but practically there are only 98
executives working and how it can be excess executives in Nashik SSA against
justified strength of 98 shown by Staff section. Copy <<<>>>. We have
specifically elaborated that if there are working executives as counted by
Staff section , we have no issue that excess executives are transferred, but we
when there is practically shortage, then executives should not be compelled to
transferred on name of excess. In our support we have shared calculation of
Kalyan SSA Copy <<<>>> for telecom wing
and Dhule SSA for account wing. We elaborated that in Dhule SSA working account
wing executives are three, proposed strength is four and one is proposed out.
If there are only three working Executives and proposed are three, then how one
executive can be transferred as out in name of excess. It will create one
shortage at Dhule SSA and again one will be posted to meet shortage, which is
not correct. Same is case with Telecom wing and hence review needs to be
taken. CE Civil Mumbai who is looking of
review of the transfers done in his period as GM HR Admn Mumbai informed that
as per his data there are 107 executives working in Nashik SSA and shared break
up this figure of Executives with total 107 and added that he has taken data
from ERP. We have responded that we have taken this data from DS SNEA Nashik
and these figures are also confirmed by GMT Nashik. Similar letters are written
by other SSAs to correct the data. CGMT MH intervened and expressed that
already matter of review of transfers is delayed and if we go to review entire
process again and publish figures as fresh, there will be much delay in
completing this exercise of review of transfers. He expressed that SNEA is
demanding for early action for review of transfers and he also is of the
opinion of restoration of remaining orders at the earliest and hence let the
process move ahead. CGMT MH informed that he has personally done this exercise
for deciding executive strength, he is aware about the issues faced by Big SSAs
and further added that he cannot ignore the requirement of executives in SSAs
having shortage of executives. In
conclusion CGMT MH expressed that there may be some discrepancies and it will
be taken care, but at this stage there should not be any issue and demand for
fresh publishing Executive strength of each SSA and appealed to let this
ongoing process get completed at the earliest and issues if any will be taken
care after restoring orders.
4.
Addition of Justified strength for each SSAs
against norms and guidelines issued by different Offices: We have drawn
attention of CGMT MH Circle towards the fact that there are guidelines issued
by BSNL CO for One Network and support teams at all BAs for CFA Copy
<<<>>> and for CM works.
Copy <<<>>> There are also
special guidelines issued by Staff section Staff
availability/requirements/structure w.r.t. mobile maintenance in selected SSAs.
Copy
<<<>>>. CGMT
MH responded that all these guidelines are taken care and all BAs have posted
the executives accordingly. We have narrated that form the In/Out data and
actually working executives at BAs, we found certain discrepancies. CGMT MH
replied that there may be certain issues and same will also be taken care to
some extent, but at the same time he cannot ignore the SSAs/BAs having extreme
shortage of executives and to balance the shortage, certain transfers are must.
We have narrated that the working of Big BAs will suffer if transfers are
issued without consideration to these norms. CGMT MH replied that he is aware
about it and has discussed it with concerned SSAs and genuine proposals from
these big BAs is already given consideration and will be taken care to extent
possible.
5.
Publication of options/requests received
before issuing transfer orders: We have drawn attention of CGMT MH about the
confusion among the executives who have submitted their willingness and are not
able to understand where options are received at Staff section and taken into
consideration. Hence it will be helpful if details of options received are
published. CE Civil Mumbai added that there ae about 90 options received and
data has been consolidated and ready but some of executives have given
conditional/confusing options. CGMT MH informed that there is no issue in
publishing options/requests received and directed GM HR Admn Mumbai informed to
publish it as per his discussions with him. GM HR responded that data is ready
and it will be published tomorrow itself.
6.
Publication of long stay list of Executives: We have reminded
CGMT MH about publication of SSA wise long stay list of executives and mainly
the list of executives who are coming under zone of transfers. It was opposed
by CGMT MH and CE Civil Mumbai stating that individuals should know their
position in long stay list and he should plan accordingly. We have narrated
that for knowing position of an individual in long stay list, he needs to know
the details of others. If it was matter of cadre like only JTO it was quiet
possible, but here JE JTO and SDE are counted together. CE Civil Mumbai
informed that they should have analysis and everyone knows who is senior and
who is junior in stay. We added that it may be possible for small SSAs, but many
not be possible for executives in big SSAs, but till there was reluctance in
part of CE Civil Mumbai and CGMT MH also was of same opinion. We have added
that when data is available with administration, there is nothing wrong in its
publication and also put forward the facts that there are two types of JEs in
BSNL and it is difficult to ascertain which JE is transferable out of SSA and
which is not transferable and hence individuals are facing issues in deciding
to submit option or not. If data is published with names which are coming under
zone of transfers, more willingness may be submitted. But many executives are
not submitting willingness as they do not have any idea about their position in
transfer and continue to submit the representations after issuing transfers.
After elaborate discussions, CGMT MH directed GM HR Admn Mumbai to publish list
of JEs who will be due for transfers and list of JEs who will not be
transferred out of SSA and there should not be any issue for other cadres as
data is already published.
7.
Consideration of JAO/JTO Rule 8 /Rule 9
requests: We have narrated
the difficulties faced by the JTOs/JAOs who have completed five years and opted
for Rule 8 transfers. We reminded that this matter is being discussed for last
one year and request of 14 JAOs and five JTOs have been already proved by CGMT
MH in Dec 20 and consent also has been received from all these Circles and
since then only matter of formal approval of relieving order was issued. CGMT
MH expressed that there is already shortage of executives and he has already
decided not to give consideration to any Rule 8 transfers. CGMT MH added that
though there may be excess JAOs/AOs but as compared to works in MH Circle, it
is difficult to relieve them. He added that there is important works like EB in
MH Circle which is generating revenue. He further informed that he has already
decided to post some JAOs/AOs in EB section as majority of revenue is coming
from EB section and there is need of keen persuasion of revenue matters. We responded
that we have no issue in posting in EB and it is good that revenue matters will
be taken care by JAOs/AOs. At the same time we have brought to his notice that
Maharashtra Circle has sufficient number of JAOs/AOs to consider these pending
Rule 8 requests even by taking care of EB works. Circle wise
Strength of AOs/JAOs <<<>>>. We have
also updated that about 84 JAOs of Maharashtra Circle are working on deputation
to different Circle under Rule 9 transfers and they are supposed to come back
to MH Circle as it is temporary transfers and none of them have completed five
years period. The JAOs whose Rule 8 transfers are pending now have continuously
worked for more than five years in MH Circle, their request are approved long
back, consent also received for concerned Circles. All are eagerly waiting for
their relieving for which file was processed to him in Jan 2021 and he has
returned with remark to reprocess after March 21. But same is reprocessed and
returned back again and matter is not decided yet. CGMT MH directed us to
discuss it with GM Fin Mumbai as he has certain issues in relieving these JAOs
under Rule 8 transfers. We have informed CGMT MH that yesterday itself, we had
discussions with GM Fin Mumbai and requested him for consideration of Rule 8
request transfers. GM Fin Mumbai has informed that this work is with GM HR Admn
Mumbai and HR section has to work on it but informed that he is having shortage
of JAOs/AOs. We have detailed discussions on it and finally GM Fin Mumbai has
assured to review overall working and think on consideration of Rule 8
transfers. CGMT MH directed GM HR Admn Mumbai to discuss JAO Rule 8 transfers
with GM Fin Mumbai and decide accordingly. Pending
JTOs/JAOs Rule 8 Requests <<<>>>. On JTO Rule 8 transfers, CGMT MH was
of the opinion that there shortage of executives and it is not possible to give
consideration to Rule 8 transfers of JTOs. We have elaborated that the
situation will continue as it is and BSNL has managed the works when thousands
of Executives have left BSNL through VRS. Now it is matter of total eight JTOs
out of about 1900 executives working in Maharashtra Circle and it can be
managed. Further, we reminded that MH Circle has issued Rule 8 transfer order
in lots ranging from 50 to 100 at a time in past, but till works are managed locally.
This time also works can be managed locally and requested CGMT MH to issue
orders and let final relieving may be decided by Units/SSAs by local
rearrangements. We added that if we keep on hold such request then there is no
chance to get substitute as BSNL has already given VRS to thousands of
executives and there is no chance of immediate recruitment of JAOs/JTOs. In
conclusion CGMT MH assured to issues the orders once the ongoing process of
transfer posting is completed. We narrated that by looking at ongoing process,
it may take more time but CGMT MH informed that entire work of transfer posting
including restoration of transfer kept in abeyance will be completed within
fortnight and its matter of just fortnight and there should not be any issue.
8.
Exclusion of names of Rule 8 JTO/JAOs from
long stay transfers: We have
also brought to the notice of CGMT MH that names of some of JTOs/JAOs who have
requested for Rule 8 transfers are under zone of transfers and orders of some
JTOs are issued and kept in abeyance. When they are waiting for Rule 8
transfers, they should not be punished by another transfer and it will also not
be useful for BSNL and hence their names should be excluded from the list of
long stay transfers if appearing anywhere. CGMT MH accepted our request and
directed GM HR Admn Mumbai for same and CE Civil Mumbai informed that it is
being take care and no JTO/JAO under Rule 8 transfer will be transferred in as
longest stayed executives.
9.
Counting of strength of Absconding/Retiring
executives while counting Executive strength:
We have
brought to the notice of CGMT MH that the executives who are due for retirement
as well as absconding from duties are taken into consideration of executive
strength and hence the actual requirement of SSA and available strength is not
matching as given by Circle Office. We requested to exclude the names of
Executives who are absconding and retiring during this year should be excluded
from the count of working strength. CGMT MH agreed to concern expressed by the
association and directed GM HR Admn Mumbai to take care of it and exclude all
such executives. CE Civil Mumbai added
that same is being taken care and any left out case same will be given
consideration.
10.
Unwanted proposal for transfers of DEs from
Shortage SSAs to Shortage to SSAs: We have brought to the notice of CGMT MH that in
stage approach, it is proposed to transfers DEs/AGMs from SSAs having shortage
to SSA having shortage. When there are directions for filling vacant post of
AGMs/DEs by local Looking After Arrangements, in wrong approach it is proposed
to transfer more DEs from shortage to shortage SSAs. In response CE Civil
Mumbai informed that these DEs/AGMs being transferred from SSA having Shortage
to SSAs having shortage are senior AGMs/DEs who are in zone of consideration of
DGM LA arrangements. There is shortage of DGMs in many SSAs and hence it is
proposed to transfers DEs/AGMs to fill vacant post of DGMs under LA
arrangements and on transfer under long stay they will be given higher
responsibility of DGMs. It was confirmed by CGMT MH that transfers in AGM/DE
Cadre from SSAs having shortage will be minimum and no AGM/DE will be
transferred if his name is not under zone of consideration of DGM LA.
11.
Issue in posting of IFA to BA Heads: We have narrated
CGMT MH how issues are being created in posting of IFAs and request Shri.
Mohite AO Aurangabad is being shunted in file and repeatedly rejected even
though he is senior. CGMT MH informed that there are certain issues raised by
GM Fin Mumbai and he has followed the recommendations of GM Fin Mumbai not to
post Shri. Mohite as IFA Aurangabad. WE have narrated that there is no any such
issue as Shri. Mohite is working smoothly and some wrong information is being
propagated about him that to be without any proof and evidences. We further
added that if he is guilty, then take action against him and decisions should
not be taken just on basis of rumors spread about any officer. CGMT MH informed
that he to believe GM Fin Mumbai and directed us to discuss with him the
issues. We responded that we have already discussed issues with GM Fin Mumbai
and he has also accepted that Shri. Mohite is senior, but is not ready to give
him charge of IFA Aurangabad. We further added that by understanding the issues
created for him Shri. Mohite has requested for change of SSA from Aurangabad to
Goa and his request may be given consideration. CE Civil Mumbai added that
there may be issue of again posting him as IFA in Goa and Ahmednagar as GM Fin Mumbai
may have issues in posting him as IFA. We demanded that if he is senior and
having vigilance clearance, he should be given charge of IFA and if he is
junior and having any official issue of giving charge of IFA, he should not be
deprived form responsibility of IFA just for fact that someone is spreading
wrong information without official records. After elaborate discussions on this
issue, finally CGMT MH directed to have review of the case and decide on
request of Shri. Mohite for posting as IFA and his request transfers.
12.
Dispute between Staff and Account wing and
pending issues and delay in Confirmation of JAOs: We have drawn
attention of CGMT MH on the long pending dispute between Account and Staff
section and how the files of FC section are under dispute since VRS 2019 and we
have discussed this issue with all DGM FC Mumbai, DGM TR Mumbai, DGM Legal
Mumbai, GM Fin Mumbai and GM HR Admn Mumbai, but matter is not yet resolved.
While DGM FC, DGM TR and GM Fin Mumbai have informed that all the files are
handed over to staff section and DGM legal is having its custody and keys of
the cupboards and he cannot deny that the receipt of FC section files. In
recent one occasion during lockdown, DGM TR Mumbai has shown all files to DGM
Legal and his team and now also keys are with DGM legal Mumbai and matter needs
to be deiced by DGM legal Mumbai. It was also informed by both DGM TR and DGM
FC Mumbai that then and last JAO FC Mumbai is working as JAO Admn Mumbai and he
was last custodian of files and hence GM HR/DGM legal has to take care of it
and there is no role of Account wing as claimed by DGM legal Mumbai. We added
that in our last meeting with GM Fin Mumbai after elaborate discussions, he has
directed DGM TR Mumbai to handover the files one by one to DGM legal Mumbai and
settle the issue. When we discussed it with DGM legal Mumbai he has denied that
he has received file. We have brought to his notice that DGM TR /FC Mumbai are
ready to handover file fresh as desired by him and he should take over it or make
arrangement for same. But DGM legal Mumbai denied for taking files now and
directed us to take up matter with CGMT MH as his discussions with GM Fin
Mumbai has not given any result and matter cannot be resolved till CGMT MH
intervenes in this high level conflict going for long time. We added that after
discussing with all and mainly as directed by DGM legal Mumbai we are taking up
matter with CGMT MH with request to resolve this conflict continued for last
one and half year. CGMT MH asked details from GM HR Admn Mumbai and he informed
that matter is recently discussed with him and he will look into it. CE Civil
Mumbai responded that the files are not handed over but only one letter is
given to PA of GM HR Admn Mumbai and JAO FC is posted as JAO Admn and given
other responsibilities. He confirmed
that this dispute is going for long time and not yet resolved after repeated
discussions on the issue. He added that he was taking care of issues on data
available with him and there are no much issues which has relations to files.
We have elaborated that the work of confirmation of JAOs is pending for long
time for want of the personal files and files related to recruitment of JAOs.
Same is case with individual grievances and we have updated that formal
approval in one of the resignation request by JAO is pending since long just
want file processed earlier and many other cases of resignation received after
that are finalized. We made it clear that no one is taking responsibility of it
and individual JAOs/AOs are sufferers. CGMT MH expressed displeasure such
ongoing conflict and directed GM HR Admn Mumbai to discuss this issue with GM
Fin Mumbai and get it settled without any further delay. He also expressed that
such small issues should be settled at GM level and there is no need of
intervention from CGMT MH.
13.
Issues in Consideration of Account wing
request for change of SSA/Retention: We have drawn attention of CGMT MH for long
pending request of JAOs/AOs for change of SSA/Retention on their transfers
issued earlier. We added that SNEA MH has submitted issues in detail about
discrepancies in these transfers and till no consideration is given except in
few cases. CE Civil Mumbai informed that review is going on it and shortly all
such requests will be given consideration along with other transfers proposed
for JAOs/AOs.
14.
Consideration of Request Transfers of
Electrical and Civil wing: We have once again drawn attention of CGMT MH
that though request transfers of Telecom and Account wing are given
consideration, there is no action taken for Civil and Electrical wing as till
issues are taken care by concerned verticals and only formal letter is signed
by DGM legal Mumbai. When we are discussing any issues with these transfers DGM
legal raises hands stating that he has not issued any orders and has only
signed order. Disputes if any should be discussed with convened verticals. CGMT
MH directed GM HR Admn Mumbai to have review of the works and transfer posting
may be proposed by Civil Electrical wings, but he has to look into HR aspects
and transfer policy guidelines and Staff section is responsible for overall
issues of transfer posting and should take care accordingly. CE Civil Mumbai
informed that he is ready with the proposal and assured to give it final shape
at the earliest. CGMT MH directed GM HR Admn Mumbai to look transfers of
Electrical wing also and decide accordingly.
15.
Consideration of request of Electrical wing
JTOs transferred to Telecom wing: We have narrated the difficulties faced by the
JTOs in Electrical wing who are transferred from Electrical wing to Telecom
wing and how their request are not being given consideration either by
Electrical wing or by Telecom wing. We have narrated the facts that they are
relieved from Electrical wing but concerned SSAs have not given works as they
are due for transfers. Some of them have completed more than seven years in
working SSA and are waiting for consideration of their request transfers, but
instead of request transfers, they are transferred to Telecom wing. We elaborated
that such cases are from Dhule, Bhandara and Nagpur SSA where already Telecom
wing executives are declared as excess and there is need of review of this
issue and given consideration of their requests. CGMT MH directed us to take up
matter with CE Electrical Mumbai. We have responded that we have already
discussed this issue with CE Electrical Mumbai has directed to take up matter
with GM HR Admn Mumbai. The proposals received from SSAs are being shunted
between Staff section and Electrical wing and issue is not decided and
concerned executives are in trouble. CGMT MH directed GM HR Admn Mumbai to
discuss this matter with CE Electrical Mumbai and put up matter accordingly to
him.
16.
Review of Transfers from yearly transfers to
Quarterly transfers: In conclusion
of discussions, we have requested CGMT MH that majority of issues during this
transfer are observed as the request transfers are not given consideration in
time and bulk transfers are issued in one lot. This process is handled at BSNL
Corporate Office on quarterly basis and no such issues are observed in any of
transfers. In Maharashtra Circle also same procedure was followed earlier. Now
BSNL OTP Portal also giving consideration to all request transfers quarterly,
but this widely accepted quarterly transfer concept is not followed in MH
Circle since last 2-3 years. Hence transfer orders are issued in bulk causing
mass unrest among executives and we are also compelled to take up all such
issues created due to mass transfers. CGMT MH also expressed that he also is of
the same opinion and there should be routine procedure for issuing request
transfers and executives held up in difficult stations should not suffer. He
has seen much issues in this transfers and opinioned that if transfers are
issued in routine manner there will not any bulk transfers and unrest thereof.
He directed GM HR Admn Mumbai to work on it and follow the procedure of
Quarterly transfer Orders for all request transfers.
After
elaborate discussions on all current HR issues for about one hour, the meeting
concluded at about 1830 hrs and we conveyed thanks to CGMT MH, GM HR Admn
Mumbai and CGMT MH for giving consideration to concern expressed by SNEA and
assured for further co-operation in implementation of transfers orders issued
as per the transfer policy guidelines in uniform policy manner which are
equally applicable to all executives. In conclusion, CGMT MH informed that he
is always ready for consideration of all genuine issues raised by association
and firmly directed GM HR Admn Mumbai to take over command of remaining review
of transfer order & related works and to complete the process of review of
the Transfers kept in abeyance within period of fortnight.
15
JUL 21: SNEA MH writes to Shri. Ramakant Sharma, CGMT MH Circle elaborating
facts and figures about criminal conspiracy by AD Admn Mumbai and
AO Salary Mumbai in extending facilities to particular Associations by misuse
of authorities of self and authorities of higher officers up to level of CGMT
MH. Letter <<<>>> Enclosures <<<>>>
·
Of the late, AD Admn
Mumbai has issued letter for grant of facilities to the executives associations
on 30/06/2021 and SNEA MH has immediately brought to his notice, the issued
created by issuing the facilities.
·
But AD Admn Mumbai
ignored same and did not respond it. Then the issues were brought to notice of
GM HR Admn Mumbai on 06/07/2021 and it was assured for corrective action, but
nothing was done.
·
Then again SNEA MH
has brought it to the notice of GM HR Admn Mumbai and DGM Admn Mumbai
onn09/07/2021 and in and immediate action all these letters are withdrawn on
09/07/2021 late evening.
·
SNEA MH has analyzed
issue and it found that AD Admn Mumbai has acted out of his powers and issued
the letters with his signature without approval of GM HR Admn or CGMT MH
·
It is seen that GM
HR Admn Mumbai has returned file with remark “to discuss” and AD Admn Mumbai
has not bothered about and issued letter without any discussions or information
to GM HR Admn Mumbai.
·
GM HR Admn Mumbai
and other responsible officers comes to notice about such letters issued and
malafide action thereof only when SNEA MH has brought to notice of them have
pointed out it.
·
On further analysis
of issues, surprisingly it is found that AO Salary who is also office Bearer of
newly formed District Body has played with financial activities and deduced
Association subscription of only particular Association since the window closed
in June 2020 to June 2021 when window for changeover
of membership or new membership was closed for all associations.
·
Further, when District Body is not yet approved
the facilities for grant of immunity are granted by certain officers in Staff
section in joining hands with all such malafide illegal actions.
·
SNEA MH has written
to CGMT by giving facts and figures about criminal conspiracy by AD Admn Mumbai and AO Salary Mumbai in extending
facilities to particular Associations and deducting association subscription of
particular association continuously for one year, with malafide intention and
deliberate actions by misuse of authorities given to them and also misuse of
powers of higher officers including CGMT MH.
·
It is crystal clear that these illegal, malafide
financial and administrative actions Certain financial irregularities continuously
going on Circle Office Mumbai and unfortunately even after bringing all such
issues to the notice of controlling officers no action has been taken, but both
these officers are given free hand to play with BSNL records and accounts for
benefit of self and association to which they have accepted membership
recently.
·
SNEA MH has demanded for to depth investigation
of entire malafide actions and issues by both these officers and Office Bearers
of association by team of officers specially nominated for it or by team of
officers from Vigilance and take suitable action against officers who are
involved in this criminal conspiracy going for last one year.
15
JUL 21: AGM LM BSNL CO endorsed the Policy for Monetisation of Land
and Building Assets of BSNL through outright sale/Transfer. Letter <<<>>>
15
JUL 21: CGMT MH writes to all BA Heads for clearance of huge OFC Faults pending for
more than 45 days. Letter <<<>>>
15
JUL 21: CMTS Bulletin June 2021. Copy <<<>>>
14
JUL 21: DGM Legal Mumbai issued orders for cancellation/retention
of transfer orders of executives who were under transfer from Non-Tenure
Stations to Tenure Stations. Letter <<<>>>
·
All these executives
have requested for cancellation of transfer orders on grounds that they have
already worked at tenure stations and retention on grounds that ward is
studying in 12th Standard and appearing for Board Exams in year
2021-22 and immunity as prominent OB of the recognized association.
·
SNEA MH has taken
stand for review of transfer orders as per BSNL guidelines on the subject and
pursued successfully for getting orders reviewed as per request of individuals
well within the guidelines.
·
The ERP relieving of
the executives working at Tenure stations was delayed due to this review and
now the data of relieving of executives under transfer is being verified with
SSAs by Staff section.
·
On confirmation of
relieving status of the executives from Non tenure SSAs, the orders for ERP
relieving of left out executives will be issued from Circle office Mumbai.
14
JUL 21: DGM Legal Mumbai issued orders for additional transfer
orders from Non Tenure SSAs to Tenure SSAs from Circle longest stay against
cancellation/retention of transfer orders of executives as per provisions of
transfer policy guidelines. Letter <<<>>>
14
JUL 21: DGM Legal Mumbai issued orders looking after arrangements
for SE Civil Mumbai on where it is as it is basis wherein Shri. A. L. Ganvir, EE Civil Mumbai will
continue to work as SE Civil Mumbai. Letter <<<>>>
14
JUL 21: JTO Admn C Mumbai endorsed orders for provision of
concessional FTTH connections to serving/retired BSNL executives as well as
Non-Executives and it is applicable only in BSNL Area. Letter <<<>>>
14
JUL 21: DGM CFA Mumbai writes BA Heads for implementation of one
Network Project and Partner Support Group. Letter <<<>>>
14
JUL 21: AGM Estt BSNL CO endorsed DoT clarification regarding
permission to join another CPSEs on contractual basis after retiring
voluntarily under BSNL VRS 2019. Letter <<<>>>
These are DoT directions for
rejecting the request from VRS 2019 optees seeking permission for joining any
other CPSEs/Government on contractual/consultancy basis as per clause 8(iii) of
BSNL VRS 2019 notification. In this letter it is further directed to withdraw
such permissions granted earlier if any.
14
JUL 21: AGM BPIT BSNL CO writes to Circle/Unit Heads calling
comments/ viewed about rationalization of P2P leased line (DLC)
Tariff/discounting policy. Letter <<<>>>
12
JUL 21: AD Admn Mumbai issued orders for withdrawal of all four
orders for grant of facilities to District Body CO Mumbai and Circle Body SNEA
and AIGETOA. Withdrawal Order <<<>>> Orders withdrawn <<<>>>
·
These orders are withdrawn as SNEA MH has drawn
attention of GM HR Admn Mumbai on serious discrepancies and biased approach in
granting facilities to the associations without approval of competent during
window open for changeover of membership of association.
·
The period of Circle Body of SNEA MH has been
deliberately reduced by one year and no corrections were issued even after it
was immediately reported to AD Admn Mumbai.
·
Further, certain issues are deliberately
overlooked while granting facilities to District Body of AIGETOA Mumbai and no
action was taken on serious violations done by certain officers in granting
facilities in such biased approach.
·
There are no issues as such reported in
facilities granted to SNEA Mumbai and AIGETOA MH Circle, but these letters also
withdrawn due to fact that same are issued without knowledge and approval of
CGMT MH Circle.
·
Matter was reported to DGM Admn Mumbai and GM HR
Mumbai on 06/07/2021 and both have assured to look into it but no action was
taken.
·
Finally, on 09/07/2021, SNEA MH has once again
discussed this issue with GM HR Admn Mumbai and drawn his attention towards
conspiracies being created by certain officers in his office.
·
GM HR Admn Mumbai was surprised to see such
orders issued as he has not given approval for issuing orders and returned file
with remark “to discuss”.
·
But AD Admn Mumbai has interpreted this remark
‘to discuss’ at his own and issued orders with his signature and even after
matter was reported to him he has not acted on it for one week with malaise
intention in mind.
·
As per guidelines on the subject followed in
Maharashtra Circle, these orders are issued with approval of CGMT MH Circle and
with signature of DGM Admn Mumbai.
·
But in this case, it is not approved even by GM
HR Admn Mumbai and file has not reached to CGMT MH and hence no question of its
approval by CGMT MH, but orders are issued directly by AD Admn Mumbai by using
powers of CGMT MH by taking CGMT MH as granted.
·
This has been done to get undue favor or for
spreading wrong message and misleading information among the executives during
period of window open for changeover of membership.
·
During discussions GM HR Admn Mumbai and DGM Admn
Mumbai have understood the seriousness of the issues and deliberate violations
done by AD Admn Mumbai and have immediately taken corrective action to withdraw
the wrong orders issued by AD Admn Mumbai.
·
It is not only matter of issuing illegal and out
of power orders by AD Admn Mumbai but there are serious financial issues w.r.t.
deduction of subscription only for particular association by AO salary Mumbai
who is one of the office Bearer of newly nominated District Body of AIGETOA
Mumbai.
·
We have narrated all these issues with supporting
documents and hence GM HR Admn Mumbai has issued direction to withdraw these
letters and we have demanded that only withdrawal of the wrong and illegal
orders is not solution and suitable actions needs to be taken against the said
officers who have deliberately violated authorities granted to them, use
authorities of higher officers without their approval/permission just with
malice in mind to give extra benefits to the association to which they have
joined recently.
·
It really surprising that these officers dares to
use authorities of GM HR Admn Mumbai and CGMT MH and all their controlling
officers are unaware about it and it comes to their notice only when it is
pointed out by SNEA MH.
·
Let us hope the matter is investigated to depth
and suitable action is taken against officers who will be involved in this scam
as per findings of investigation so that no one dares to work in such biased
approach just for gaining benefits to the association they belongs or to
project their image as leaders of association giving wrong message that CGMT MH
and GM HR Admn Mumbai are powerless and have work only as per directions given
by them
12 JUL 21: AD Staff A Mumbai issued third extension for DGM LA orders
for Telecom wing and now it is extended up to 31/08/2021. Letter <<<>>>
·
As the fresh DGM LA arrangements could not be
finalized for last four months the original order for 179 days is now extended
for more 120 days.
·
Due to this extension, the executives working as
DGM LA will be continuously working as DGM LA for more than 270 days from
original orders dated 26/11/2020.
·
Many officers given LA Order in original Order
dated 26/11/2021, are transferred to other SSAs and have joined and there is
need of modification about their SSA accordingly, but nothing is mentioned
about it.
·
Two AGMs are transferred out of Circle and have
joined assigned posting on transfer, but till their DGM LA order is given
extension.
·
Some AGMs posted as AGM Operations are also
transferred, but as the original order is extended without any such
corrections, their names will be shown against the SSA where they were posted
as SSA Heads before transfer.
·
As only extension orders are issued and some
names are dropped on name of Vigilance clearance, some post have become vacant,
some were vacant since last DGM LA Orders there are many post of DGMs vacant
and CGMT MH also has given instructions for issuing fresh/additional DGM LA
Orders to fill vacant posts, but same are not being followed at below line as
if the instructions of CGMT MH has no meaning.
·
It seems that without taking much pains and
efforts for review, the simple funda of extension after extension that to be
without any break of single day is being used by Staff section and this may be
challenged at any time.
·
Let us hope that the review of DGM LA is done
before 31/08/2021 and fresh orders with incorporations of changes required and
this will be last extension to old DGM LA order.
12
JUL 21: AD Staff A Mumbai issued third extension for DGM LA orders
for finance wing and now it is extended up to 31/08/2021. Letter <<<>>>
·
The original DGM LA Orders for Account wing was
issued on 28/11/2020 for period of 179 days and there after no extension order
was issued in May 2021 and since then all these officers were working without
extension order.
·
It is reported that some individuals have managed
to get issued extension orders at their offices /units, but general extension
order was not issued and same is issued now after period of two months.
·
As per this orders, these executives will
continue to work as DGM without break for more than 179 days period as
mentioned in LA arrangements.
·
All such issues which normally taken care while
issuing any extension order are not issued and entire team from AD to CGMT MH
is new and orders are reviewed in casual approach to complete office formality.
·
As per restricting norms there is need of
separate CAO TR and CAO Finance as well as DGM Fin in all BAs , but only DGM
Fin are posted under LA arrangements and no CAOs are posted. Many other AOs
also can be elevated as CAO, but same is not being taken care and only few
orders of CAO LA are issued on pick and choose basis by Circle Office, while
powers for same are with BA Heads.
·
The date mentioned in reference letter number is
wrong and it should be 28/11/2021 instead of 18/05/2021, for which corrigendum
will be issued.
·
Let us hope that Staff section give importance to
Account wing also and take corrective action as per BSNL CO guidelines by
issuing fresh DGM LA Orders and BA Heads issue CAO LA Orders as per guidelines
and availability of posts in all SSAs/BAs and units.
12
JUL 21: DGM HR Mumbai endorsed BSNL CO orders regarding submission
of self appraisal along with list of 56 executives who have not submitted
self-appraisal and requested all these executives to submit self-appraisal of
e-APR 2020-21 before 15/07/2021. Letter <<<>>>
12
JUL 21: CGMT MH writes to GM L&B Mumbai and all BA Heads for
achieving targets assigned for land molestation & to generate income by
utilising vacant staff quarters and planning for monitoring of entire campus for
monetization. Letter <<<>>>
12
JUL 21: CGMT MH writes to all BA Heads for real time accounting of each and every moment
in inventories. Letter <<<>>>
12
JUL 21: CGMT MH writes to all BA Heads for real time accounting of each and every moment
in inventories. Letter <<<>>>
10 JUL 21: Meeting
with Shri. S.V. Nakhale, GM HR Admn Mumbai: Team SNEA MH consisting Shri.
A. Y. Kesarkar, JS CE SNEA MH, Shri. M. N. Kotambe, CS SNEA
MH and Shri. M. S. Adasul, CS SNEA MH had meeting with Shri. S.V. Nakhale, GM HR Admn
Mumbai on 07/07/2021 wherein the following issues were discussed in depth.
1.
Biased
approach and misuse of authorities by certain officers in Admn and Account
section in granting facilities to Associations: We have brought to
his notice the malpractices done by certain Officers in Admn Section and
Account section in granting facilities to the associations. We have narrated
the deliberate issues crated by these officers while granting facilities to
SNEA MH and AIGETOA Mumbai. We also asked what is need of issuing such specific
letters which were not issued for last one year when window for changeover of
membership of association is open and pointed out that some nexus is going on
this matter for last six months and these letter at this specific time are
final action of illegal and biased activities going on for last one year. It
was to our surprise that GM HR Admn Mumbai informed that he has not yet
approved the proposal in file for granting/extension of facilities as per BSNL
REA Rules and there is no question of issuing such letters. We have brought to
his notice that there are four such letters issued on single day 30/06/2021. GM
HR Admn Mumbai also was surprised and informed that he returned for back with
remark to discuss and proposal is not yet approved. We have handed over
him copies of all four letters issued by
AD Admn Mumbai and how he can say that he has not yet decided on the proposal.
We also narrated case by case, how undue favor is done in granting facilities
to AIGETOA Mumbai Branch and how the period of SNEA MH has been deliberately
reduced by one year. We also added that after issuing letter on 30/06/2021,
late evening, immediately on 01/07/2021, these issues has been brought to
notice of AD Admn Mumbai and later to DGM Admn Mumbai also. Both have assured
to have corrective action by withdrawing these letters and issuing fresh letters,
but till no action has been taken for last one week. We have also elaborated
how AD Admn Mumbai and AO Salary Mumbai have taken certain actions beyond their
powers for illegal deduction of membership of association when window for
membership is not open. We have also elaborated with facts how the AO Salary
Mumbai has misused the ERP authorities given to him to deduct subscription of
AIGETOA Mumbai by deliberate violation of BSNL REA Rules and guidelines for
deduction of subscription. We also narrated that AO Salary and AO Admn Mumbai
are the responsible for checking that BSNL REA rules are not violated in
granting facilities as well as checking that no subscription of any association
is changes when the window for same is not open. But it’s unfortunate that the
salary deduction of both these officers have been stopped for association to
which it was deducted and fresh deduction has been started for AIGETOA Mumbai.
Both are very active office Bearers of AIGETOA Mumbai and hence have taken such
illegal actions and steps in favor of the association towards they have
accepted membership as well as leadership.
GM HR Admn Mumbai was astonished to see such activities happening under
him without his knowledge and was worried about the happening going on is
office. After understanding the depth of criminal conspiracy going on, he
assured to look into the matter personally and assured to withdraw these
letters and issue fresh letters as per the norms and guidelines for granting
facilities to associations recognised under BSNL REA Rules. We demanded that
only withdrawal of letters and issuing fresh letters is not the solution, but
action needs to be taken against the culprit officers who have deliberately
violated the powers delegated to them and misused powers of GM HR Admn Mumbai
and CGMT MH in grating facilities to associations in biased approach. GM HR
Admn Mumbai assured to take suitable action against these officers if found
guilty of misuse of powers and authorities and also assured for issuing
corrected orders for grant of facilities to the associations.
2.
Undue delay
in Consideration of JAO/JTO Rule 8 /Rule 9 requests and hardship faced by these
executives: We have
drawn attention of GM HR Admn Mumbai towards long pending issue of JTO and JAO
Rule 8 transfers and requested him to consider Rule 8 requests submitted by all
JTOs/JAOs. GM HR informed that these us shortage of executives in Telecom as
well as account wing and hence CGMT MH has decided to keep on hold all Rule 8
Requests. We have narrated that majority of cases of Rule 8 transfer of
JTOs/JAOs are already approved by CGMT MH Circle in December 2020 and consent
from other Circle is also received by Staff section and only issue pending is
the formal orders for relieving these JAOs/JTOs. GM HR informed that there many
such cases and they cannot be relieved at this time. We have brought to his
notice that there are no more cases of request transfers either in JAO or in
JTO Cadre. There are only eight Rule 8 request of JTOs and only 18 Rule 8
requests of JAOs and its very small figures as compared to total working
strength of executives in MH Circle. Detailed
List <<<>>>. Out of total eight
request of JTOs , five cases are already approved by CGMT MH Circle in month of December 2021 and three cases are
kept on hold by them GM HR Admn Mumbai
and hence are yet to be processed for approval of CGMT MH. Same is case
with JAOs Rule 8 Transfers as Out of total eighteen request of JAOs , Fourteen
cases are already approved by CGMT MH Circle in month of December 2021 and
three cases are kept on hold by them GM HR Admn Mumbai and not even processed
for approval of CGMT MH. Important point
is that consent for eight JTO Rule 8 Request and 14 JAO Rule 8 requests have
been received from concerned Circles and naturally all of them needs to be
relieved for their choice circle but none of them is relieved for last six
months and all of them are feeling cheated by staff section officers by
repeated assurances for issuing relieving orders. Many have informed that AD
Staff A Mumbai and DGM legal Mumbai are informing that all the Rule 8 requests
are kept on hold as there is shortage of executives in Maharashtra Circle and
it cannot be confirmed when it will be issued. GM HR added that he has taken
information on this subject and added that as there is shortage of executives
in Maharashtra Circle, CGMT MH has decided not to relieve these officers. We
asked him till what time it will be kept on hold and what are steps being taken
for arranging substitute for these JTOs/JAOs. He added that there is no chance
of getting substitute but some JTOs/JAO on rule 8 may be called back. We
categorically brought to notice of GM HR Admn Mumbai that it is wrongly
projected that there is any relation between Tule 8 and Rule 9 transfers. Further it is also wrongly projected that
there is shortage of JTOs and JAOs in MH Circle. We have handed over him the
Circle wise data of JAOs/AOs working all over India. Copy <<<>>>. We have
categorically pointed out that MH Circle has total 348 JAOs/AOs and if we add
JAOs on deputation it comes to be 432. This is highest figure among all Circles
and hence there is no shortage of JAOs in Maharashtra Circle, rather there are
excess JAOs in Maharashtra Circle as compared to all other Circles. Same is
case with JTOs and Maharashtra Circle has higher number of JTOs among the
circles. Also now MH Circle has started counting combined stay of JEs/JTOs and
SDEs together, which comes to be about 2000 numbers. Hence it is not difficult
to relieve eight JTOs out of combined strength 2000 Executives. GM HR was
surprised to see these figures and factual position and was doubtful about
these figures. We have cleared him that we have taken the data of account wing
from ERP and Telecom wing data is already published by his office and hence it
is authentic and if required he can confirm it from ERP. GM HR Admn Mumbai informed that he is not
aware about these figures and if it is the case, then there should not be issue
in consideration of requests. We requested him to bring it to the notice of
CGMT MH with these figures, in response GM HR informed that he has already some
preliminary discussions and CGMT MH has directed him to wait till the within
Circle transfer orders are issued. We have responded that within Circle
transfer orders cannot be reason for withholding Rule 8 transfers. Rather it is
need of time that Rule 8 transfers needs to be given consideration before the
within Circle transfers as names of some of JAOs under Rule 8 are under zone of
transfers due to restricting of SSAs and BAs. Also, it is better that these
JTOs/JAOs are not counted in strength of any SSA as their cases are already
approved for transfer. GM HR Admn Mumbai agreed to the views expressed by SNEA
and assured to have discussions with CGMT MH and he has no issue if CGMT MH
agrees for same. We have elaborated that CGMT MH is kind enough to consider all
Rule 8 requests, if the files are processed with facts and figures. But
unfortunately files are processed with inadequate information and certain
officers are giving misleading information to CGMT MH that these is shortage of
executives in Maharashtra Circle and requested him to direct AD Admn A and DGM
legal to process the files with factual figures and we are confident that if
files are processed with factual position, CGMT MH will definitely understand
pains and difficulties faced by these JAOs/JTOs and will definitely approval
the proposal. In conclusion, GM HR Admn Mumbai assured to discuss this issue
with CGMT MH as fresh and to take suitable action to release Rule 8 request
transfers of all JAOs/JTOs at the earliest.
3.
Publication
of SSA wise Working Executive strength: We have narrated that the revised SSA wise In and
Out data is nothing but cheating of executives as nothing clear has bene given
about working strength. GM HR Admn Mumbai informed that he has seen the said “in
out” letter and he also is surprised to see that nothing is clear from this
letter. He at his own added that the letter should have SSA wise figures under
different columns showing justified strength, working strength, Excess shortage
so that everyone gets clear and transparent picture about the executive’s
strength in any SSA. He added that now data is published and hence nothing can
be done on it and all these activities are done by Ex GM HR Admn Mumbai and he is
not yet involved in it. He further added that it should have bene brought to
his notice before issuing these letters. We have added that we have informed it
to DGM legal Mumbai about showing working and justified strength, but he said
that he is following orders of old GM HR to go with In out figures only and he
has not received any order either for old GM or new GM to change the format. We
have reminded that this has been assured by CGMT MH in online meeting with all
associations, DGM Legal has informed that he is not aware about what CGMT
decides and he has been told by old GM HR Admn Mumbai to go ahead only with IN
and Out figures and he is doing so. We have handed over the copies of SSA wise
Executive strength published earlier in MH Circle. After having look at it, GM
HR informed that this is correct method and shared that SSA wise data needs to
be published in such format in totally transparent manner. We also narrated that here also files is
being moved with wrong information and requested him to take over the control
on all such acts as GM HR Admn Mumbai as he is answerable to all this wrong
acts to CGMT MH. This wrong data has already caused issues and hardship to
executives and similar action to publish same data with minor changes has no
meaning at all. We also elaborated to GM HR Admn Mumbai case by case basis how
the proposed strength is shown wrongly and more confusion by adding total
figures from JE to DGM together, by proposing transfer of DEs from shortage to
shortage SSA, wrong working figures inclusion of names of JTOs/JAOs under rule
8 and all India transfers etc. After patience listening GM HR Mumbai has
assured to discuss this issue with CGMT MH and assured to have corrective
action for transparent working by publication of data.
4.
Publication
of long stay list of SSAs having excess Executives: We have narrated
the issues due to non-publishing revised list of SSA wise longest stayed
executives including JEs and how the executives are under confusion and unaware
about their position in long stay list. Further in counting of stay of JEs,
very critical issue is observed that some JEs are SSA Cadre and some are of
Circle cadre and SSA Cadre JEs are not considered in transfers out of SSA. Till
the names of JEs under zone of transfers and not in the list of transfers, it
is difficult for individual to access his her position in the long stay list.
We added that individual cannot access data from ERP or data being taken into
consideration by staff section for issuing transfer orders and till this data
is published no one can understand and come forward willingly and submit
options. We further added that these issues were discussed in depth with
meeting by CGMT MH with all associations and it was directed by CGMT MH to
publish the long stay lists, but same is not done by DGM legal Mumbai and even
though said data is available with him on which he has processed data of In Out
transfers. After understanding concern expressed by SNEA, GM HR Admn Mumbai
expressed that he is not aware about the discussions held in past in online
meeting but has assured to discuss this issue also with CGMT MH and take
corrective action.
5.
Publication
of list of Request transfers and Options received: We have requested GM HR Admn Mumbai to publish
list of request transfer from Non-Tenure to Non-tenure SSAs which will be given
consideration showing their names, working and requested SSA. We also requested
to publish the list of options/ willingness received by Staff Section for
filling vacant posts in different SSAs. This will ascertain that the email
request/option submitted by individual is taken into consideration by staff
section or not and it will be transparent working. This will help individuals
to analyses the working strength of his working SSA/ requested SSA or his
position as substitute under incoming request transfers. GM HR agreed to our concern and informed that
the review of transfers is being done by EX GM HR Admn Mumba and he is not
involved it. We have responded that as GM HR Admn Mumbai, he has to take
responsibility of review also and issues cannot be left to others who are not
holding the charge as it is matter of important HR issues applicable to all.
Finally, GM HR Admn Mumbai assured that he will discuss it CGMT MH and bring to
his notice the concern expressed by association and see what best can be done
on this front. We brought to the notice
of GM HR Admn that the last date for submission of options in 09/07/2021 and if
issues are cleared before this date it will be easy for all executives under
zone of transfers to decide their position and opt accordingly. GM HR Admn
Mumbai assured to discuss all these issues at the earliest and added that if
CGMT MH agrees then there should not be any issue of last date of options.
6.
Purifying the list under consideration for transfers
by exclusion of certain categories of executives: We have
drawn attention of GM HR Admn Mumbai that in list transfer orders kept in
abeyance it was found that names of the executives who have opted form out of
Circe transfers were added making it double transfers for them and loss to BSNL
of issuing such transfers at company cost. To avoid such incident again, we
requested him for exclusion of names of executives who have opted for inter
Circle transfer under OTP Portal, executives under transfer to All India Hard
Tenure Stations, executives under Rule 8 Transfers, and executives under
transfer to CNTXW Circle and avoid double transfers. GM HR Admn Mumbai agreed
to concern expressed by SNEA and assured to take necessary action for exclusion
of all such names.
7.
Official
letter for change of tenure stations of Account wing: We have elaborated
that as per discussions held by SNEA MH with CGMT MH for clearing confusion on
tenure stations for Account wing, it has been finally decided to keep tenure
stations for account wing executives also same as that of Telecom wing and it
has been implemented by issuing first such order from tenure transfers. But
till today, no formal letter is issued for change of tenure station for account
wing executives. GM HR Admn Mumbai assured to look into it and get such order
issued.
8.
Fresh
Orders for DGM LA as extension also expired: We have brought to the notice of GM
HR Admn Mumbai that the period of DGM LA Orders has been expired long back and
it is continued by issuing extension orders. Also extension orders issued are
without any break in Looking after arrangements. We also drawn his attention towards fact that
though extension order has been issued for Telecom wing no such extension order
has been issued for Account wing and some officers at their own have issued
orders for extension of DGM LA but no any letter is issued for all DGM LA in
finance wing. Further there are much changes in scenario when the earlier DGM
LA was issued and some names excluded in last spell for no mistake on part of
individuals needs to be added in the list of DGM LA and some names needs to
exclude from DGM LA. GM HR Admn Mumbai informed that file for extension of DGM
LA is already processed and assured to issue the fresh DGM LA for Telecom as
well as Account wing as early as possible.
9.
Review of
SSA wise Justification of executives in Civil and Electrical wing: We have requested
to GM HR Admn Mumbai for review of SSA wise executives strength for Electrical
and Civil wings as per uniform policy applicable to all SSAs/BAs and at least
give justified post equally for all SSAs/BAs in same category. At present the
justification of post is not done uniformly and hence some executives are
unnecessarily being disturbed on name of excess shortage. GM HR informed that
he has to understand issues and then he can decide on it and requested us to
give him time to understand issues.
10.
Consideration
of Request of Electrical wing executives declared as excess sand deputed to
SSAs: W have brought to
notice of GM HR Admn Mumbai the difficulties faced by these executive by
untimely orders for Telecom wing when they are eligible for long stay
transfers. WE have added that we have discussed this issue with CE Elect Mumbai
and he has directed to take up matter with GM HR as their request is to be
given consideration by his office only and electrical wing has sent e-file for
same. GM HR Admn Mumbai informed that he also has seen this e file, but same
seem to be sent back to Electrical wing. He assured to give consideration to
request of these JTOs in Electrical wing depurated to Telecom wing.
11.
Issues in
Consideration of Account wing request for change of SSA/Retention: We have drawn
attention of GM HR Admn Mumbai for review of the transfer orders of Account
wing executives issued earlier, which is pending for long time. We also have
shared copy of letter given by SNEA MH on the subject and narrated in brief
issues created due to such pick and choose transfers. GM HR assured that he is
not aware about these issues and will take up updates from concerned officers
and will take suitable action to review all these case.
12.
Dispute
between the Finance wing and HR wing on handing over files of Account wing: We have drawn
attention of GM HR Mumbai about issues created due to prolonged dispute between
DGM Legal and DGM Fin Mumbai about the handing over the files of FC section and
how it has delayed the works of confirmation of JAOs who have completed two
years’ probation period and how the request of JAOs are not settled even after
they have left BSNL and joined other organizations. WE have categorically
brought to his notice about request of JAO who has lefts BSNL before two years,
but till his formal relieving order is not issued and file is pending in old FC
section office. He re DGM Fin Mumbai says that files are handed over to DGM
legal and DGM legal says that files are not handed over and only letter is
given DGM Fin Mumbai. We have further added that we have discussed this issue
with DGM Legal Mumbai and he was of the opinion that the Account section and
DGM Fin is not cooperating him as neither files have been handed over to him
nor the suitable JAO/AO is transferred for taking care of these works. DGM
legal has stated that matter is well known to GM HR, GM Fin Mumbai and even
CGMT MH and firmly said that now CGMT MH has to take action on it. When
requested to discuss this issue with DGM Fin Mumbai and get it settled, DGM
legal has informed that he has already discussed it with GM Fin Mumbai but
there is no response and now he will not discuss it with DGM Fin Mumbai and let
CGMT MH take action on it. We further informed GM HR that we have discussed
this issue with DGM Fin Mumbai and it has assured that the files are
transferred along with transfer of then JAO FC Mumbai Shri Raju Pathak and he
has already joined under GM HR Admn Mumbai along with all files and records of
FC section. DGM Fin Mumbai further
informed that one more JAO Mrs. Nisha Chaudhary has been transferred to GM HR
Admn Mumbai and hence there is no need to post further AOs/JAOs in staff
section. We have made it clear to GM HR Admn Mumbai that this dispute is
pending for last one and half year i.e. since VRS 2019 and there is immediate
need to settle this issue by resolving prolonged dispute between DGM Legal and
DGM Fin Mumbai. In conclusion GM HR Admn Mumbai has assured to look into
dispute and see that HR works of account wing are also taken care properly and
also assured to look into pending orders for confirmation of JAOs.
13.
Issues
related to fake cast compliant and review thereof: We have detail
discussions on manmade issues created by certain officers in joining hands with
certain complainant and harassment of executives and non-executives working in
BSNL. We have narrated incident how executives
in ST Category is mass are named as fake cast and how atrocities have been
created over the year. The certain officers are playing with life and
sentiments of the executives in ST Category. Many executives under compliant
have submitted valid cate certificate, but till time they have been defamed as
employee with Fake caste. We also narrated how executives who have applied for
VRS or retired from services are being deprived even from Provisional pension
by officers dealing with case by wrongly interpreting orders from BSNL CO. GM
HR Admn Mumbai informed that he is aware about the case and his office has just
conveyed to CCA for releasing provisional pension to all such
employees/executives and very shortly it will be paid. He added that there are certain
issues to be taken care by BSNL CO and he will see that all the guideline sand
orders issued by BSNL CO will be followed in Maharashtra Circle. He directed us
to take up issues with BSNL Corporate Office and assured to extend all possible
co-operation from his office as per direction of CGMT MH Circle.
14.
Rearrangements
of DGMs in Circle Office Mumbai: We have brought to notice of GM HR Admn Mumbai
about unequal distribution of DGMs in Circle Office Mumbai and his office has
more DGMs but other offices do not have DGMs for long time. We have also
narrated him that CGMT MH has instructed to issue orders for additional DGM LA
for filling vacant post in EB, Mobile, and Transmission section and since last
3-4 months the files is not initiated and direct instructions of CGMT MH are
ignored. We elaborated wrong practices started by giving HR works to DGM legal
and by giving Admn works to DGM HR when ne separate DGM Admn is also posted.
Such posting is creating confusion among executives and offices and it is underutilization
of available manpower. There is need of either correcting designations or
rearrangements of works, but HR activities should be with DGM HR and not with
DGM legal as mismanaged now. GM HR gave patience hearing to our say and assured
to have review of working of DGMs in Circle office Mumbai very shortly and have
proper distribution along with filling of vacant posts in different sections
either by rearrangements or by addition LA orders.
15.
Decision of
Distribution of Certificate of VRS Opted Executives: We have again
drawn attention of GM HR Admn Mumbai about undue delay in distribution of
Certificates of VRS Optees from Circle Office Mumbai. GM HR Admn Mumbai
immediately instructed DGM Admn Mumbai to instruct AD Admn Mumbai to handover
the certificates to all the VRS Optees who are visiting or will be visiting for
medical related issues and further directed to send remaining certificates to
the residential address of concerned VRS Optees and see that all the
certificates are distributed in time bound manner of two months.
16.
Stopping
deduction on Medical reimbursement on discount: We have reminded
GM HR Admn Mumbai about our discussions in the last meeting on the said subject
and till no action has been taken on it. GM HR Admn Mumbai informed that he did
not get time for same, but assured to review it and decide on it at the
earliest.
17.
Review of
higher rates approved for canteen beyond tender period: This issue also
was again brought to the notice of GMHR Admn with consequences of tendering procedure
and issues thereof. GM HR Admn Mumbai directed DGM Admn Mumbai to look into
issues and see that fresh tenders are called by CPC section.
In conclusion, we
requested to GM HR Admn Mumbai to look into issues and settle all these issues
with priority to the issues related to publication of SSA wise executive
strength, Long stay list of executives, list of Request/options received by
staff section as it is time bound process and there is already delay in
reviewing transfer orders kept in abeyance. In conclusion GM HR Admn Mumbai
assured to take care of all these issues one by one and meeting concluded with
thanks form both the sides.
8 JUL 21: DGM Legal Mumbai endorsed the JTO to SDE Promotion orders and all
the promoted executives are posted as where it is as it is basis. Letter <<<>>>
·
DS SNEA concerned
are requested to take up matter with SSA/BA Administration for endorsing these
orders where it is as it is basis at par with decision of BSNL Corporate
Office. Rearrangements among executives required if any can be done later and
there should not be any delay in joining of these promoted officers on name of
rearrangements.
·
All the promoted
executives are requested to submit their joining report/Charge assumption
report immediately as it is where it is basis and most probably by today
itself.
·
This is fasted work
done by the officers in Staff section and need highest appreciation by all.
·
SNEA MH conveys sincere thanks and gratitude to Shri. Ramakant Sharma, CGMT MH Circle, Shri. S.V. Nakhale, GM HR Admn Mumbai, Shri. Baban S. Laswante, DGM Legal Mumbai, Shri.
D. G. Bangera, AD
Staff A Mumbai, Mrs. S.V. Khadgi,
AD Staff B Mumbai for very prompt action and endorsing the
JTO to SDE Promotion of Executives promoted in Maharashtra Circle and posting
all where it is as it is basis
8 JUL 21: Congratulations!!!. DGM Pers JM BSNL
CO issued orders for promotion of 3697 JTOs as SDE Regular and important is
that all are posted as it is where it is basis. Order <<<>>> MH List <<<>>>
·
SNEA MH Congratulates all
the Executives who are promoted as SDE Regular and conveys best wishes for
their grand success in the promotional assignment where it is as it is.
·
SNEA MH conveys sincere thanks to all SNEA CHQ
leaders and specifically Com. P. P. Rao, AGS and Com R. S. Kolapkar, AGS for their day and night persuasion of getting
these orders issued in the early morning today. F
·
As this is where it is as it is order issued by
BSNL CO, SNEA MH will pursue for endorsing this order as where it is as it is
basis and hopefully it will be issued today itself.
·
All promoted executives are requested to assume
the change as SDE Regular by submitting the joining Report to controlling
Officers today itself.
·
All comrades are requested to go through the list
and missing name if any may be intimated by email on sneamh@gmail.com, we will
pursue for getting their names included in this SDE promotion order. these JTOs we
7
JUL 21: Jt GM Pers SM BSNL CO issued orders for opening of Window
of Online Transfer Portal from 16/07/2021 to 31/07/2021 for submitting inter Circle
request transfers by SDEs/AOs and above
cadres. Letter <<<>>>
·
This Online Transfer
Portal (OTP) has been introduced in this financial year and requests for any
inter Circle transfer orders in SDE/AO and above cadre are to be submitted by
online through self ESS Login.
·
Though , the orders
for First Quarters are not yet issued even though the time schedule given for
it over, this window of OTP is being opened from 16th July 2021 and
it has been clearly mentioned in this letter that who has applied earlier need
not to apply again for same transfer.
·
By taking experience
in past, there are certain modifications done in this revised procedure and now
no SSA/BA Head can keep on hold the request of any Officer and if no action is
taken by SSA/BA Head or Circle GM HR, the applications pending in their Login
ID will be automatically be received by PGM Pers BSNL CO and it will be given
consideration.
·
Further, in case of
BAs having more than one GM/PGM, tone of them will be nominated for
recommending the OTP request transfers.
·
GM HR concerned has
to put remarks viz. completion of tenure period at all India Hard Tenure period
or the position of executive in the longest stay list of Circle and stay period
in Circle on post/Station/Circle.
·
It is expected that
the transfer orders of the executives who have applied under OTP in last
Quarters will be issued in this week itself.
7
JUL 21: Jt GM Pers SM BSNL CO issued timelines for all executives
in submission of self-Appraisal of e-APR 2020-21 latest by 15/07/2021 with
warning that non-submission of Self-Appraisal in given time will be viewed
seriously and further action will be taken as per extent rules. Letter <<<>>>
SNEA
MH appeals all the executives to follow the instructions and submit the
self-Appraisal of e-APR 2020-21 well within this extended time and avoid last
minute rush or office complications thereof.
7 JUL 21: DGM Admin BSNL CO issued orders for provision of concessional FTTH
connections to serving/retired BSNL executives as well as Non-Executives and it
is applicable only in BSNL Area. Letter <<<>>>
·
This was long pending demand raised by SNEA, same
is given consideration by Management Committee of BSNL subject to 40%
concession on Plan Charges with celling of Rs. 300 per month in BSL Area.
·
In MTNL area, the existing guidelines for
providing concessional Broadband will continue.
·
This concession is available only to plan charges
and the concerned employees/executives will have to bear the cost or rent of
Modem, installation Charges, activation charges as applicable in case of
provision of FTTH Connection to ordinary subscribers.
·
The FTTH Connection, working under private
capacity and or 10% concessional scheme will be allowed to be migrated to this
plan.
·
This concessional FTTH Connection will be
provided in lieu of the existing concessional Broadband, FSRTC or concessional
FTTH Connection under 10% discount.
6 JUL 21: DGM HR Mumbai endorsed BSNL CO Order for extension of timelines for
processing e- APR of Year 2020-21 wherein the date of submission of self
appraisal is extended to 15/07/2021, the date of reviewing APRs is extended up
to 30/08/2021, date of reviewing APRs is extended up to 30/09/2021, date of
disclosure of APRs is extended up to
15/10/2021 and completion of overall process of completion of e-APRs of
year 2020-21 is extended up to
31/12/2021. Letter <<<>>>
6
JUL 21: AGM Pers BSNL CO writes to all Circle Heads for giving wise
publicity to All India Provisional
Gradation/Seniority list of JAOs of Batch 2015 and to check certain service
records and confirm details. Letter <<<>>>
6 JUL 21: DGM Legal Mumbai conveyed extension for authorization to BA Heads
for issuing orders for AGM/DE LA arrangements as per local seniority up to
31/07/2021. Letter <<<>>>
6 JUL 21: AGM Pers BSNL CO issued orders for ERP relieving of AOs under inter
Circle transfer and who were not relieved by their controlling Officers and all
these Officers are relieved w.e.f.
05/07/2021. Letter <<<>>>
6 JUL 21: AGM Estt BSNL CO endorsed DoPT Guidelines on treatment/
regularization of hospitalization/quarantine period during pandemic Covid
19. Letter <<<>>>
3 JUL 21: DGM Legal Mumbai published data of executives in Telecom Wing and
Account wing showing Transfer “In” and “Out” of executives from Particular
SSA. Telecom Wing <<<>>> Account
Wing <<<>>>
·
The last date for submission of options directly
by email on adstaffbmhco@gmail.com adstaffamhco@gmail.com or agsmstaffmh2018@
gamil.com is 09/07/2021.
·
In second phase of review of Transfer orders kept
in Abeyance, the review of transfers from and to Non Tenure Stations is being
done as per concern raised by SNEA MH by pointing out the issues in publishing
data in transparent manner and CGMT MH and GM HR Has assured to publish data
showing the actual working strength and executives in long stay in Particular
SSA.
·
But it is seen that data is republished in same
format continuing with the attempt of hiding the important figures of working
Executives and list of executives who are at the top of SSAs having excess
Executives strength.
·
It is difficult for one to access for
individuals, where he/she is in the long stay list of executives or not and who
has to opt for transfers at these stations and just showing “In/Out” numbers
will not solve the purpose of calling Options for filling vacant posts.
·
Only changes made seems to be done in this
revised letter is that the number of executives who are relieved as per earlier
transfer order before it was kept in abeyance and there is reduction in number
of vacant post in SSAs having shortage of executives as compared to earlier
figures which will reduce the number of transfers to be effected for filling
vacant posts.
·
Till there is confusion as in telecom wing for
“Transferred In” the Executives in JE/JTO/SDE Cadre are shown as 69 whereas
transferred out is shown as 71 which should have been equal as it is aimed at
filling out only vacant posts.
·
For account wing this figure tallies as total 40
JAOs/AOs are shown as “Transferred In” and “40 JAOs/AOs are shown as
Transferred out”.
·
In DE/AGM Cadre, till the officers in Staff
section seems to be under confusion as Excess DEs/AGMs are shown as Four only
and Transferred in are shown as 11 and difference is shown as Seven wherein
executives will be posted from SSAs already having shortage of AGMs/DEs, which
is against the guidelines issued by BSNL CO to meet shortages in DE/AGM cadre
under local Looking After arrangements.
·
It is difficult to understand how vacant posts
can be filled by creating another vacancies at other SSAs/BAs, but there are
certain assumptions on part of these officers, and hence such proposals are
moved in file.
·
Before publishing data, we have drawn attention
of DGM Legal Mumbai on this issue quoting assurance given by CGMT MH to publish
data in Transparent manner showing Justified post, working Executives and then
Excess/Shortage and but DGM Legal Mumbai informed that he has not received any
instructions from CGMT MH and hence he is following the old method without any
changes. When asked, what use of republishing data is, he replied to take up
matter with CGMT MH Circle.
·
SNEA MH will discuss these issues with GM HR Admn
Mumbai and CGMT MH and will pursue for getting data published with working
strength and long stay list of executives from SSAs having excess executives as
per this data.
·
Meantime, SNEA MH has received many call from the
members as these letters have created much confusion and fresh doubts/fears
among the executives as new sentence is added and nothing is taken care as
assured by CGMT MH for transparent working.
·
The sentence added in letter that No request
shall be considered from Shortage to surplus BA/SSA has created more
confusion and unrest among executives who have requested for transfer and whose
request has been given consideration in last order which has been kept in
abeyance. It is feared by these executives that their request from SSA having
shortage executives to Excess executives will not be given consideration. We
have seen that someone is deliberately trying to create confusion among the
members and no one should get confused as CGMT MH has assured to given
consideration to request transfers of all executives from Non tenure stations
who have completed three years stay at present SSA as on 30/06/2021.
·
It is to inform that these are letters calling
for willingness /options for filling vacant posts in SSAs having shortage of
executives and not filling vacant post in SSA/BAs having excess Executives.
·
As such, there was no need of addition of this
sentence as that No request shall be considered from Shortage to surplus BA/SSA
because no such transfers are under consideration in this phase of review. But
as seen in past, some extra ordinary officers in Staff section are playing with
the sentiments of the executives just to create confusions and fear in minds of
executives or may be due to lack of knowledge/information about discussions and instructions given by
CGMT MH in the meeting held with SNEA and online Meeting with all three
Associations.
·
Please note that these are options/willingness
called for filling vacant post in SSAs having shortage of executives and hence
only options are to be given if anyone is the Top of long stay list of SSAs
having shortage of executives and due for transfer to SSAs having shortage of
executives.
·
For example, in Nagpur SSA Nine executives of
Telecom wing are shown as transferred out from Nagpur SSA, then then Top Nine
executives in cadre of JE, JTO and SDE with combined long stay list will be due
for transfer out of Nagpur SSA and only such nine executives will have to opt
for any of the SSA where shortage of executives is shown i.e. Ahmednagar, Beed, Akola, Yavatmal, Buldhana,
Jalna, Dhule, Kolhapur, Nanded, Parbhani, Satara, Solapur, Osmanabad and CO
Mumbai wherein “Transfer In” figures are shown.
·
Thus these Nine long stayed JE/JTO/SDE in Nagpur
SSA will have to opt for any of SSA or be ready for posting in any of these
SSAs and their transfer order will be issued in the Company cost with
preference to the Own cost Transfers means if anyone opts at own cost, he will
be given priority over another opting at company cost and maximum consideration
of options for any particular SSA will be to extent of vacancies shown.
·
As such, one working at SSA/BAs having excess
executives has to ascertain his/her position at the combined long stay list of
their SSA in Telecom wing JE/JTO/SDE and in Account wing JAO/AO, number of
Executives excess in their SSA and decide to opt for any suitable place among
these SSAs or be ready for posting at any of these SSAs at company cost.
·
The executives in SSAs/BAs not having excess
executives as on today, may have analysis of the “Incoming Requests” to
their SSA/BA and ascertain the possibility of their transfers during
consideration of request transfers on one to one basis and be ready for posting
in BA/SSAs from where incoming requests are pending to their SSA. If he /she is
not willing to join as substitute to any of these SSAs, then he/she should
review, think and opt for any of the SSA/BA wherein vacancies are shown as of
now as at later stage it may not be possible even though it may be nearby SSA
/BA.
·
The executives who are already under transfer at
Odd Place/locations and do not want to join that place and may opt fresh for
any of these SSAs/BAs of his his/her choice wherein vacancies are shown now.
·
This is right time to have critical analysis of
the position of self in SSA combined long stay list of JE/JTO/SDE , JAO/AO and
DEs/AGMs, Excess/Shortage of executives
in SSAs/BAs and incoming request to their working SSA and wisely opt for any of
the choice SSA/BA.
·
It is seen that many of the executives do not opt
for any of station assuming that one more is ahead of him and her and such
small gap can be crossed at any time due to change in circumstances and hence
one has to take advance action to avoid last minute issues and
difficulties.
·
Further, the executives who have opted for not
joining tenure station second time and working in SSAs having excess strength
are requested to opt for any of the SSA/BA as called in these letters as they
are in long stay list of SSAs and their names are under consideration for
posting in any of these SSAs/BAs.
·
It is fact that the time taken by officers in
staff section to review the orders and data is more, but to take care of issues
created due to pick and choose transfers earlier, it is taking time more than
the fresh works, but SNEA MH is continuously pursuing for early restoration of
orders by resolving issues created and to reduce difficulties faced by the
executives due to pick and choose transfers.
·
The executives not in SSA long stay list need not
to be panic even if they have applied for request transfer earlier and his/her
order is kept in abeyance, as same will be released after filling these vacant
posts most probably in period of fortnight
·
Though remaining issues will be discussed and
will be taken care with confirmation from GM HR Admn Mumbai, SNEA MH appeals
all executives in general and executives in SSA long stay in particular to have
critical analysis of the data of excess/shortage of executives and their
position in the long stay list of their SSAs and submit options accordingly or
be ready for transfers at any of these BA/SSAs at company cost.
2
JUL 21: DGM Admn BSNL CO issued orders for dispensing off the
Administrative scrutiny in processing claims of briefcase, Mobile, newspaper
and towel and now all these claims will be
processed by Finance section. Letter <<<>>>
2 JUL 21: DGM Admn BSNL CO issued orders for dispensing off the
Administrative scrutiny in processing claims of briefcase, Mobile, newspaper
and towel and now all these claims will be
processed by Finance section. Letter <<<>>>
2 JUL 21: Jt GM Pers BSNL CO issued clarification for processing of
e-APRs in case of demise of reporting Officer. Letter <<<>>>
2 JUL 21: GM EF/FC BSNL CO issued KPI Targets for Circle IFAs for
IPMS of financial Year 2021-22. Letter <<<>>>
2 JUL 21: DGM CMTS BSNL CO issued Targets for net Addition of 50 lakh
GSM Connections during financial Year 2021-22 and Maharashtra Circle is given
Target of Net 243578 GSM Connections. Letter <<<>>>
2 Jul 21: AGM LM BSNL CO issued orders for eempanelment of valuers for valuation of land and building assets of BSNL. Letter <<<>>>
2 JUL. 21: AGM Pers BSNL CO writes all Circle Heads for relieving of
AOs under transfer to different Circles but not yet relieved by concerned
Circle latest by 02/07/2021, failing which they will be relieved through ERP by
Personal Section. Letter <<<>>>
2 Jul 21: Jt GM Vig BSNL CO endorsed CVC letter to Circle Vigilance
Heads for reporting cases of deviations from CVC advice. Letter <<<>>>
2 JUL 21: AGM RM CFA BSNL CO writes to CGMT MH Circle about withdrawal
of Circle specific Bharat Fibre Broadband plan 100 GB CS 106 @Rs.555 for new
customers. Letter <<<>>>
2 JUL 21: DGM CNO BSNL CO issued Standard Format for sending OFC laying
proposals for approval by BSNL CO. Letter <<<>>>
NB: The information given on this site is restricted to SNEA members only. The content of the pages of this site shall not be quoted or reproduced as an evidence elsewhere either in part or full for any purpose.